Laserfiche WebLink
.fir �3 <br /> .<C %".ZrJ <br /> rtM,EN rA,L HEAT_Ii <br /> p c E , <br /> 9g AIDISr� —7 AH I0' 50 Pete Wilson <br /> Governor <br /> State Water April 2, 1998 <br /> Resources <br /> Control Board <br /> Division of Arthur L. Wyatt <br /> Clean Water 6265 Crooked Stick <br /> Programs Stockton, CA 95219 <br /> Mailing Address: <br /> P.O.Box 944212 , <br /> Sacramento,CA PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 1088, <br /> 94244-2120_ _— _.SITE ADDRESS: -45-1-i-PACIFIC AVE,-STOC--KTON;CA­95207' - <br /> 2014 T Street, <br /> Suite 130 I have reviewed your request,received on April 1, 1998, for pre-approval of corrective action costs. I <br /> Sacramento,CA will place these documents in your file for future reference. I have included a copy of the "Cost Pre- <br /> (916)227-bolo pp q Approval Request"form. Please use this form in the future for requesting pre-approval of corrective <br /> (916) <br /> FAX(916)2274530 action costs. <br /> World Wide Web With the following provisions, the total cost pre-approved for com letin the Jan <br /> http://www.swrcb.ca. g 1> p pp p g uary 7, 1998, <br /> gov/-cwphome/ Advanced GeoEnvironmental workplan approved by the San Joaquin County EHD(County) in their <br /> fundhome.htm March 4, 1998 Ietter, is $25,935. The pre-approved amount includes costs for activities related to the <br /> installations of eight borings to 60' bgs.each using Geoprobe and four 60 foot groundwater monitoring <br /> wells with two completed as dual nested wells. Such activities include project management,report <br /> preparation,permit/permitting, equipment, materials, well development/survey, and laboratory analyses <br /> (8015m/8020 for TPHg/TPHd/BTEX, 8240/8260 for MtBE and other oxygenates). Upon completion <br /> of the work,you are required to submit the results to the County and the Fund for reviews. Note: Costs <br /> associated with monitoring, investigating, and remediating non-petroleum contaminants, i.e., VOCs are <br /> not eligible for funding, . <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. Future casts for <br /> corrective action must meet the requirements of Article 11, Chapter 16, Underground Storage Tank <br /> Regulations. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the-County artd the Reg�g tonal Water ty "4 '� <br /> t, .. .. - . Quali Control <br /> Board. <br /> • `. If a different scope of work becomes necc-ssary, then you must request pre-approval of costs on <br /> the new scope of work. <br /> Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> t� ensure their proper allocation and efficient use for the benefit of present and future generations. <br />