My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:44:19 PM
Creation date
5/5/2020 2:12:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.Deceniber 2001 <br /> ;f AGE-NU Project No, 95-0128 <br /> Page.3 of 12 <br /> W 4 <br /> -40.feet bsg -TPH-g was not;detected h•a_ny of the grab water.samples collected; but TPH 'd was <br /> S F <br /> ._ detected in`seVen of.the eight:grab watei samples-at concentrations as high:as-1,200- g/1..'Various' <br /> BTEX cornpounds were detected tri the grab water.samples frorri-borings B13,.B14 afid'B17 at <br /> _ concentrations.as high as 1'4.micrograms_per.liter(µg/1),benzene was detected onlyin the-sample . y : <br /> -collected•from boring B1.3 a:t.a depth of:60"feet bsg; at,a-•concelitration of 0:61-•µg/1 In addition, a } <br /> _ MTBE-was-detected in seven-of the,eight-grab,ground water samples collect ed.at:a-.maximum <br /> J. <br /> concentration of 1,400 µg/ly in sample 1316-H2O TBA was detected in'sampl-eB13 HzOB'at a <br /> 14 <br /> concentration of46 µg/1 `-r <br /> rt <br /> On 20 March 2001, groundwater extraction well-EW 1.Was installed at the site for performance of- _ <br /> a ground water pumping test.At the.regulatory directive of the EHD a twelve-hour aquifer pump test-' - <br /> _wasperformed on 27 March-2001 to assess the general-'grou_rid water aquifer characteristics and to I <br /> = assess aqu fer_response to ground water extraction,at a',co_nsOnt pumping-rate utilizing:well EW-1 <br /> for ground water extraction and wells°1VIW=1,_MW-2,IMIW 4,MW-5 and-MW-6.andvaporwell:VW- <br /> 1 as observation wells::Three groundwater samples were collected from'the extracted ground water, <br /> and purged ground water was.containerized in anon-site 6;500 gallon poly tank..The Implications <br /> z_ 1 <br /> from the March 2001 aquifer-ground water,pumping_test are <br /> Ground'water draw=down-of at:least 11.45 feet was oliserved;in'extraction well EW=1" r� <br /> -' followin 700 minutes of continuous um in 5'.GP'-Ml • ound water draw=down was- 71 <br /> f observed in well-MW,-55 (located 15 feet to the east)'at 1.1 feet,.well MW=4.(lacated 60 feet'"' <br /> f , ,. <br /> toward fhe sou#heast) at Q l fee A,_well MW-6 (lac'ated 50 feet toward.the north=northwest) t. <br /> at'-0 121eet and in welt vapor well,-VW-1 (located 60 feet toward the west} at_0.06 feet - <br /> - Utilizing a semi=logarithrnlc plot of.ground water draw down vs observation well distance . <br /> 3, _ to pumping.'well, a_bek, re can-.be utilized tot.project a :radius of influence of ; <br /> approximately 65 feet at S,GPM Utilizing the I]istance-Drawdown Method,a transmis'sivity s <br /> .•. - _ _ <br /> -was calculated at 205 ftZ/day.(equivalent to 1,536 gallons-per day/ft) and a storativity value- <br /> was-calculated of 0:054 <br /> _ - Based on a transmissivity_value of 205.ft2/day and the e extraction well screen thiclaies`s equal . <br /> - to 25 ft (screen-interval at; EW.=1},_, a hydraulic: conductivity value was :calculated <br /> 61.44.ft/day, or 0.022 cm/s; a hydraulic conductzvxty-of;0.022 -cm/s.is consistent with a { <br /> screened interval located within a-well,sorted.sand to'clean`sand ` <br /> ` �� Laboratory analysis t,of'extracted dater during the purriping-jest'"detected .elevated.Y- • ` �" <br /> tions of TPH BTEX grid MTBE <br /> Concentra 4 g, <br /> r On 05 and 06 June 2001, four ground water monitoring wells-were-installed off-site as part of the,. <br /> •-invesiigafion. Borings MW13 through MW 16 were completed.as ground water monitoring wells-. <br /> - £ ' - r Y Adva)fced GeoEnvironmental,Inc <br /> S` - <br /> f_ '•- _ - _ -'� - A r'-. �1 f'` 1, ''] S. k'• '.-r� -. <br />
The URL can be used to link to this page
Your browser does not support the video tag.