Laserfiche WebLink
' On 15 and 16 March 2004, one additional ground water extraction well and three soil-vapor <br /> extraction wells (EW-2, VW-2 through VW-4) were installed at the site The extraction well <br />' EW-2 was completed using 6-inch diameter PVC casing, with 0 03-mch slotted screen installed <br /> from 35 to 55 feet bsg, while well VW-2 through VW-4 were completed as vapor extraction <br /> wells using 2-inch diameter PVC casing, with 0 02-inch slotted screen installed from 20 to 35 <br />' feet bsg <br /> Between 19 and 20 May 2004 a soil-vapor extraction network was installed at the site SVE <br /> 1 remediation began in January 2005 and has removed Approximately 1,509 kg (3,327 pounds) or <br /> 532 5 gallons of hydrocarbons during the first quarter 2005 <br /> At that time, the dissolved MTBE plume has been defined down-gradient of the site (east) by <br /> wells MW-12, MW-16, MW-17 and 18 <br /> 1 <br /> 1 <br /> 1 �r <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />