Laserfiche WebLink
Appendix A - Historical. Background <br /> PACIFIC MINI-MART <br /> 4511 Pacific Avenue, Stockton, California <br /> • Based on a transmissivity value of 205 ft2/day and the extraction well screen thickness equal <br /> to 25 ft (screen Interval at EW-1), a hydraulic conductivity value was calculated at <br /> 61 44 ft/day, or 0 022 cm/s, a hydraulic conductivity of 0 022 cm/s is consistent with a <br /> screened Interval located within a well sorted sand to clean sand <br /> • Laboratory analysis of extracted water during the pumping test detected elevated <br /> concentrations of TPH-g, BTEX and MTBE <br /> On 05 and 06 June 2001 four ground water monitoring wells were Installed off-site as part of the <br /> investigation Borings MW13 through MW16 were completed as ground water monitoring wells <br /> MW-13 through MW-16 MTBE was detected in the soil samples collected from thirty feet bsg from <br /> borings MW15 and MW16, these concentrations maybe more reflective of impacted ground water <br /> in the pore spaces of the soil than of adsorbed MTBE <br /> The highest concentration of dissolved hydrocarbons quantified as TPH-g,TPH-d and overall BTEX <br /> I compounds occurs in the areas east and northeast of the dispenser islands, on-site The highest <br /> concentration of MTBE detected in the ground water occurs In monitoring well MW-11, which is <br /> 1 situated in the median ofPacific Avenue High concentrations of MTBE exist in well MW-11,lower <br /> 1 i or non-detectable concentrations in the down-gradient and cross gradient wells defined the dissolved <br /> F MTBE plume toward the north and west This may Indicate that the dissolved MTBE plume is <br /> detaching from the TPH/BTEX hydrocarbon plume <br /> In September and October 2001 a low-flow> ground water extraction and treatment system was <br /> installed at the site The system utilizes the newly Installed ground water extraction well on site and <br /> a small volume treatment system As of 16 December 2002, approximately 1,315,454 gallons of <br /> hydrocarbon-impacted ground have been extracted and treated for disposal <br /> IOn 04 and 05 February 2003 two additional ground water monitoring wells were installed off-site <br /> as part of the investigation Boring MW 17 was completed as groundwater monitoring well MW-17 <br /> using two-inch diameter PVC casing with 0 020-Inch slotted screen installed from approximately <br /> 25 feet to 45 feet bsg and boring MW 18 was completed as ground water monitoring well MW-18 <br /> using two-inch diameter PVC casing with 0 020-inch slotted screen installed from approximately <br /> 60 feet to 65 feet bsg and with blank casing extended to the surface <br /> At that time,the dissolved MTBE plume has been defined east of well MW-16 bywells MW-17118 <br /> • <br /> Advanced GeoEnvironmental Inc <br /> J <br />