Laserfiche WebLink
. B19 a 8 <br /> k <br /> McDonalds <br /> PROPOSED GROUND WATER 'd <br /> EXTRACTION WELL B14 9� <br /> n <br /> MW-6 <br /> B151,x,1# <br /> 1 M2 <br /> B13 <br /> VW--it MW--4 <br /> •B4 1 <br /> FORMER 1 <br /> ARCO <br /> B10 <br /> B2 1 <br /> I � <br /> MW-7 <br /> B17 -� � <br /> ELECTRICAL <br /> SERVICE LINE MW-3 GROUND WATER <br /> B3 ' EXTRACTION NETWORK <br /> 0 <br /> RDSE � <br /> 2,000-LBS <br /> CARBON VESSEL MW-7 <br /> 55-GALLON * PACIFIC CAR WASH WELLS <br /> VAPOR GAC MW -8 <br /> AIR-STRIPPER <br /> 750-GALLON <br /> SETTING TANK <br /> RAW WATER INLET <br /> [� LEGEND <br /> BLOWE (35 CFM) D BUILDING <br /> VAPOR EXHAU <br /> TREATMENT DINE MW-5* MONITORING WELL LOCATION <br /> VW-1 + VADOSE ZONE WELL LOCATION <br /> WATER TREATMENT <br /> . LANES/DISCHARGE �- PROPDSED MONITORING WELL LOCATION <br /> • SOIL BORING LOCATION <br /> N <br /> 530 6O SITE PLAN - REMEDIATION SYSTEM Advanced <br /> GeoEnvironmental, Inc. <br /> -= d PACIFIC MINI-MART (FORMER ARCO)FEET <br /> • <br /> 4511 PACIFIC AVENUE PRORCT xa 95-012e JFM ARC05 IFIGURE <br /> STOCKTON, CALIFORNIA DATE 28 OCTOBER 2000 DRAWN BY mA 1 5 <br />