Laserfiche WebLink
' 22 May 1998 <br /> • AGE-NC Project No 95-0128 <br />' Page 4 of 4 <br />' locations for the wells <br /> • The next quarterly ground monitoring event should be scheduled for May or lune 1998 <br />' 6 Prepare a revised Correction Action Plan, with additional ground water remediation options, <br /> if soil and ground water remediation Is required for the site <br /> 1 <br /> 5.0. LIMITATIONS <br /> i <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br />' upon analytical results provided by an independent laboratory Evaluations of the geologic <br /> conditions at the site have been made from a limited number of available data points (I a monitoring <br /> wells), and subsurface conditions may vary away from these data points No other warranty, <br />' expressed or implied, Is made as to the professional recommendations contained In this report <br /> I <br /> I <br /> r <br /> • <br /> Advanced GeoEnvironmentai Inc <br />