My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008170
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS_XR0008170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:34:05 PM
Creation date
5/5/2020 2:44:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008170
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 9 M <br /> Ile 17 March 1996 <br /> AGE-NC Project No 95-0128 <br /> Page 8 of 8 <br /> required, the installation of additional ground water monitoring wells will be required <br /> a The collection and field screening of grab ground water samples should be performed prior <br /> to installation of any new monitoring wells Additional well locations should be determined <br /> Ibased upon field observations and/or field analysis of the grab ground water samples <br /> • Additional soil vapor extraction and/or in-situ air sparging wells should be installed <br /> concuirently with additional monitoring wells, in preparation for active remediation at the <br /> site <br />' 0 Upon determination of the lateral extent of dissolved hydrocarbons at the site, a Corrective <br /> Action Plan Addendum should be prepared discussing ground water remediation alternatives <br /> The neat quarterly ground monitoring event should be scheduled for May 1997 Wells MW-4 <br /> Ithrough MW-7 and VW-1, as well as any additional wells installed, should be sampled <br /> 6.0 LIMITATIONS <br /> I• Our professional servit,es were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic <br /> Iconditions at the site have been made from a limited number of available data points (: e monitoring <br /> wells), and subsurface conditions may vary away from these data points No other warranty, <br /> expressed of implied, is made as to the professional recommendations contained in this report <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.