My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008177
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS_XR0008177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:29:36 PM
Creation date
5/5/2020 2:46:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008177
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6 UST Installation <br /> L In May 1994., tivo 12,000-gallon USTs and associated piping were installed at the site. The <br /> tank installation was performed by Goirrs Envirortrnental Construction of Sacramento, <br /> California. The southern tank is separated into h%,o 5,000-gallon and one 2,000-gallon <br /> sections. The tanks were installed in the same excavation from which the former USTs were <br /> removed. The stockpiled soil from the UST removal was used to backfill the eastern area <br /> of the tank excavation. The location of the new USTs are shown on Figure 2. <br /> A conductor casin was installed near the .center of the previous tank cluster during the <br /> g P g <br /> installation of the new tanks to facilitate the possible drillina, and installation of remediation <br /> wells in this area. v <br /> 3.0 PROCEDURES <br /> 3.1 Monitoring Well Purge Procedures <br /> GeoAudit recommended discontinuing-groundwater sampling from NIW-1. Analytical results <br /> front this well have consistently established that groundwater is not impacted in this «sell. <br /> Ms. Margaret Lagorio of the PHS/El-1D Verbally agreed to GeoAudit's recommendation, and <br /> only M\�1-2 and M\V-3 were sampled. <br /> _ On December 28, 1994, a 5olinst water leve! meter ,vas used to measure the depth to <br /> cyrourtdwater in the three monitoring wells (Table 1). After watef• levels were measured, PVC <br /> IP <br /> bailers were used to purge approximately 9 gallons of water from MW-2 and MW-3. <br /> Temperature, pH and conductlVity Were measured at one-gallon intervals using an lCM <br /> water analyzer. The pu-roe water was placed in DOT-approved drums and stored on-site. <br /> TABLE 1 <br /> RELATIVE GROUNDN ATER ELEVATIONS <br /> Arco Mini Mart <br /> 4511 Pacific A�,enue, Stockton, CA <br /> Relative Depth to Groundwater Relativ=e Groundwater <br /> Well Casino Elevation <br /> No. Elevation � <br /> - 3194 9194 L/94 3194 9194 12/94 <br /> MW-1 99.07 49.69 52.31 50.55 49.38 46.76 48.52 <br /> MW-2 98.02 48.91 51.53 49.76 49.11 46.49 48.26 <br /> MW-3 98.66 49.36 51.91 50.19 49.30 46.75 48.47 <br /> All meawremoils m lect <br /> G-1.1,"I Audis 5,rv—,.Inc. <br /> ARCO QR12 Nur-1.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.