Laserfiche WebLink
r <br /> r <br /> W. <br /> All work for this project wag performed under the responsible charge of a Registered Geologist.Our <br /> r professional services were provided using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities.The findings were mainly based upon <br /> analytical results provided by an independent laboratory. Evaluations of the hydrogeological conditions <br /> r at the site for the purpose of this investigation are made from a limited number of available data <br /> points, and subsurface conditions may vary away from these data points The information contained in <br /> this report ha% received appropriate technical review and approval.This acknowledgement is made in <br /> lieu of all wai ranties, either expressed or implied. <br /> Project. QUARTERLY REPORT <br /> Arco Mara-Mart <br /> 4511 Pacific Avenue <br /> Stockton, California <br /> Performed by. Geological Audit Services, Inc. <br /> 1803 West March Lane, Suite A <br /> Stowkton, California 95707 <br /> IField Activities Conducted by <br /> )-X--47- 9 3 <br /> Kevan McKibben Date <br /> Staff Geologist <br /> Scott Tipton Date <br /> Environmental Technician <br /> Report Written and Reviewed by <br /> -=7-g <br /> Bob N-lariy v Da►e <br /> Project Manager r <br /> tED GE <br /> B CyF��C��� <br /> I - - No 3475 <br /> Victor B Cherven Date <br /> Principal Geologist J'r <br /> IRegistered Geologist #3475 9 Cr CAL1F0`t°�� <br /> L <br />