Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containmentstructures. The completed form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submitt I to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: JESSE&KUL PETROLIUM ARCO Date of Testing: 6/5/18 <br /> Facility Address: 1711 E YOSEMITE MANTECA CA 95336 <br /> Facility Contact: JESSE Phone: <br /> Date Local Agency Was Notified of Testing:5/23/18 <br /> Name of Local Agency Inspector(if present during testing): <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 4162 n1 Street Galt,CA 95632 (2 9)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Testing: ®Ed Stearns ❑ Zane A.Nimmo ❑ David A.Wink er ❑ Felix G.Ramirez <br /> 8883080-UT 8883064-UT 8883059-UT 8883072-UT <br /> Credentials': ®ICC Service Tech. ® SWRCB Tank Tester <br /> 3.SPILL BUCKET TESTING INFORMATIOri <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87-1 2 87-2 3 91 4 <br /> Number, Stored Product, etc. <br /> ❑ Direct Bury ❑Direct Bury ❑ Direct Bury E] Direct Bury <br /> Bucket Installation Type: ®Contai ed in ❑ Contained in <br /> ®Contained in Sump ®Contained in Sump Sum Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 12 1/4 12 121/4 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Tj): 0900 0900 0900 <br /> Initial Reading(Ri): 11 11 11 <br /> Test End Time(TF): 1000 1000 1000 <br /> Final Reading(RF): 11 11 I 1 <br /> Test Duration(TF—TI): IHR IHR IHR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: rf Date:6/5/18 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />