Laserfiche WebLink
SW-R.C]3,January 2002 Page of <br /> 9. SPILLIOVER1FILL CONTAINMENT BOXES <br /> Facility is Not Equipped With.Spill/Overfill Contaipment Boxes ❑ r <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By, 0 Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure C Vacuum 0 Hydrostatic <br /> 0 Other(Spec) _ <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Sox# Spill Box# Spill.Sox# Spill BOR# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacutuWwater and <br /> startin test: <br /> Test Start Tilmc: <br /> . I L <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(Rr}: <br /> 'fest Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Ti!Re9ult <br /> COmmeRtS— (include information on repairs»zade prior to testing, and reco,nmended ollow-up for ailed tests) <br />