My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> N <br /> OCT 0 9 2014 <br /> PLLD Transducer Installation Red Jacket Stan aL rd and O-EN ^LTR <br /> DEPARTMENT <br /> 8. Thread the PLLD transducer into the SwiftCheck valve (ref.Figure 4 or Figure 5 as appropriate). <br /> Q IMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel in- <br /> volved. <br /> 9. Get a watertight cord grip from the transducer installation kit and coat its 1/2"NPT threaded end with U L- <br /> classified,nontoxic pipe sealant suitable for the fuel involved.Screw the cord grip into one of the openings in <br /> the weatherproof junction box.Feed the end of the PLLD transducer cable through the cord grip and then <br /> tighten the rut to ensure a watertight seal.Connect and seal the pressure transducer wires to the wires from <br /> the TLS console as described in'Epoxy Sealing PLLD Transducer Feld Wiring Connections'on page 21. <br /> 10. The PLLD SwiftCheck valve eliminates the need for the pump's Pressurstat or functional element relief valve <br /> so it must be modified as part of the PLLD system installation.Remove the six 1/4-28 slot-head screws from <br /> the Pressurstat or functional element [Figure 6]. <br /> 1 1. Remove the spring,piston and diaphragm. <br /> 12. Carefully reassemble the Pressurstat or functional element using a new diaphragm suitable for the fuel <br /> involved.Be sure that all mating surfaces are free from debris when reinstalling. <br /> 13. Torque the six slot-head screws to 40-65 in-lbs. <br /> 14. Open the ball valve down line from the pump. <br /> I WARNING. <br /> Failure to properly reseal the Pressurstat or functional element may result in <br /> =rr product leakage,which could create serious environmental and safety <br /> 'L v hazards. <br /> Fire,explosion,or ground contamination could occur. <br /> Carefully reassemble and reseal the Pressurstat or functional element, <br /> following the procedures described in this manual. <br /> Functional � t <br /> PressurstatT T� element PLLD/SwiftCheck <br /> OR <br /> e � <br /> ��I 6 I <br /> I I w, i <br /> Remove spring& piston!"I"II � <br /> Replace gasket <br /> L j 2_ <br /> Figure 6 Modifying the pressurstatffunetional element In Red Jacket pumps <br /> Y <br /> 3 <br /> 12 <br /> LZ'd E9699V960Z wneloJled elgeila2j e01•:c0 t1L 60100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.