My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEIVED <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used O)nl_ <br /> 0 Check this box if no tank gauging or SIR. UKITC1.9-Md" <br /> 'I'his section must be completed if in-tank gatiging equipment Is used to petltwimili�WAB*Atf H <br /> Complete the following checklist: )EPARTMENT <br /> FE- <br /> _ON o* Has all input wiringC_been inspected for proper entry and termination, includink testing Cor aground faults'Yes I Z� <br /> 0—yes C] No' Were all tank gauging probes visually inspected for damage and residue build:lp? <br /> Yes f- - <br /> I Noy` Wits accuracy of system product level readings tested? <br /> D—yes No* Was accuracy ofsystem water level readings tested? <br /> 0 Ts No* Were all probes reinstalled properly? <br /> Ch Ni)" Were all items on tlic equipment manufacturer's maintenance checklist completed? <br /> ................. <br /> In the Section H.below,describe[low and when these deficiencies were or will be corrected. <br /> C. Line Leak Detectors (LLD): 0 Check this box if 1.1,Ds tire not installed. <br /> Cont Bete the rollo ing checklist: <br /> 0 Yes No* For equipment start-up or annual equipment cer(ilication. was it leak simulated to verity LLD performance? <br /> 'irriulated leak rate: 0_1�p.li- El 0. p -1 0,2 .P.1" 11. <br /> .3 N A wheckalithatappti-) 16,. .11; E <br /> 0 Yes C] No* 1k ere all U_Dsc�onfirrned operational and accurate within regulatory requirements? <br /> 1 0 Yes r <br /> No* Was the testing apparatus properly calibrated`? <br /> ................ <br /> 0 Yes 0 No" I-or mechanical IA.Ds,does the LLD restrict product flow if it detects a leak'.' <br /> 0 NA <br /> ............. <br /> 0 Yes 0 No* For electronic L.I..Ds,does the turbine automatically shut oft if the LLD detv.c s leak? <br /> 0 NA <br /> E Yes E, No* For electronic LIDs, does the turbine automatically shut off if any portion ol'the monitoring system is disabled <br /> r] N A or disconnected' <br /> 0 Yes 0 No* For electronic LL.Ds. does the turbine automatically shut off if an �)rtion of the monitoring system <br /> malfunctions or fails a test? <br /> 0 Yes ❑ Ne;; For electronic LLDs,have all accessible wirinu connections been visually i14� ected? <br /> N A ..........- <br /> tol i %ere all i <br /> in the Section 11,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: TEST 87 I'LLD ONLY,91 IS A MECHANICAL <br /> Monitoring Certification Test Report <br /> Of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.