My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL/ULC Listed Red Thread®11 A Piping System <br /> GENERAL SPECIFICATIONS <br /> Primary Piping <br /> SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic 2,06 Acceptable Manufacturers - NOV Fiber Glass <br /> (FRP) pipe for single wall fuel handling and fuel handling vent Systems, 501-568-4010,or approved equal. <br /> and vapor applications including gasoline, unleaded gasoline, <br /> gasoline/alcohol mixtures, bio-diesel and diesel up to 150°F <br /> Section 3 - Material and Construction <br /> and 250 psig cyclic pressure. <br /> 3.01 2°-4" Pipe - The pipe shall be manufactured by <br /> the filament winding process using an amine cured epoxy <br /> SECTION 2 - General Conditions thermosetting resin to impregnate strands of continuous <br /> 2.01 Coordination - Material furnished and work glass filaments, which are Wound around a mandrel at a <br /> performed under this section shall be coordinated with the 543/4" winding angle under controlled tension. The pipe <br /> related work and equipment specified under other sections, shall be heat cured and the Icure shall be confirmed using a <br /> i.e.Valves, Flexible Connectors, Equipment. Differential Scanning Calorimeter. <br /> Pipe shall be supplied with a T.A.B.- (Threaded and <br /> 2.02 Governing Standards - Except as modified or Bonded)ends. <br /> supplemented herein, all materials and construction methods Pipe shall have a minimum continuous cyclic pressure <br /> shall comply with and be tested in accordance with the rating of 125 psig at 150°F in accordance with ASTM D2992, <br /> following standards and test methods: Procedure A or UL 971 pressure rating. <br /> Standards and Test Methods: All pipe shall be 100% hydrotested at the factory before <br /> UL971 Standard for Nonmetallic Underground Piping for Flam- shipment at a minimum pressure of 265 psig and shall be <br /> 2004 mable Liquids UL971-2004 Listed and labeled. <br /> ASTM Standard Classification for Machine-Made"Fiberglass" 3.02 ASTM D2310 Classifications (at 73.40F) <br /> D2310 (Glass Fiber Reinforced Thermosetting Resin)Pipe 2'-3° RTRP-11AF <br /> ASTM Standard practice for obtaining Hydrostatic or Pressure 4" RTRP-11 AH <br /> D2992 Design Basis for"Fiberglass" (Glass Fiber Reinforced (Mechanical properties cell classifications shown are <br /> Thermosetting Resin)Pipe and Fittings rninimurns.) <br /> 3.03 Fittings - All fittings shall be manufactured using <br /> 2.03 Operating Conditions - in addition to the above the same type of material as the pipe. Fittings may be <br /> listed minimum design requirements, the system shall meet manufactured either by compression molding, filament <br /> the following minimum operating conditions: winding, resin transfer molding or contact molding methods. <br /> a. Operating Pressure All fittings, adapter, and sump penetrations shall be UL971- <br /> 2004 Listed. <br /> b. Fluid Conveyed Fittings shall be adhesive bonded matched tapered bell <br /> c. Test Pressure and spigot. <br /> 3.04 Connections - Connections to flex connectors or <br /> 2.04 Quality Assurance - Pipe manufacturer's quality other piping materials shall be made by the use of NPT <br /> program shall be in compliance with ISO 9001 and/or API Q1. (National Pipe Thread) threaded adapters or flanges bonded <br /> to the FRP piping system. <br /> 2.05 Delivery. Storage. and Handling - Pipe and fittings 3.05 Sump Penetrations - Sump penetrations shall be <br /> shall be protected from damage due to impact and point made by means of a permanently bonded FRP coupling. The <br /> loading. Pipe shall be properly supported to avoid damage coupling shall be capable of adjusting for the slope of the <br /> due to flexural strain. The contractor shall not allow dirt, piping system entering or exiting the sump wall. <br /> debris or other extraneous materials to get into pipe and 3.06 Adhesives - Adhesives shall be manufacturer's <br /> fittings. All factory machined areas shall be protected from standard for the piping system specified. <br /> sunlight until installed. <br /> www.fgspipe.cem <br /> 2700 West 65th Street 25 S.Main Street KISY Fiber Glass Systems <br /> Little Rack,Arkansas 72209 Sand Springs,Oklahoma 74063 <br /> Phone:1 (501)568-4010 1(918)245-6651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.