My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X7/31/2017 06:03 5107963470 SHARMA PAGE 02 <br /> Jesse & Kul Petroleum Enterprise, Inc <br /> Yosemite Avenue ARCO AMPM <br /> 1711 E. Yosemite Avenue <br /> Manteca, Ca 95336 REOxEIVED <br /> JuE��ti , 2017 <br /> JUL 3 12017 <br /> Attn: John Alaniz <br /> Environmental Health Department ENVIRONMENTAL HEALTH <br /> 1868 East Hazelton Avenue DEPARTMENT <br /> Stockton, CA 95205 <br /> Ref: Responses to the inspection reports dated June 5, 2017 and June 21, 2017 for <br /> the Yosemite Avenue Arco AMPM, 1711 E. Yosemite Avenue, Manteca, CA 95336 <br /> Dear Mr. Alaniz, <br /> The final inspection completed on site on.June 30 th verified completion of all <br /> items listed in the above previous two inspections. The final inspection listed <br /> these reports as addendum which allows final response by July 30 th and as <br /> confirmed with you on phone. Even though, the final report superseded the <br /> partially completed above inspections, an itemized response is listed as follows: <br /> June 5�jnspection; <br /> Item 109: <br /> Secondary containment test was completed prior to final inspection <br /> Item 121: <br /> A written response was provided to EHD previously and the concerns were <br /> addressed. <br /> Item: 201 and 209: <br /> Comments noted and discussed with the Designated operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.