My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5757
>
3500 - Local Oversight Program
>
PR0545642
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:56:44 AM
Creation date
5/6/2020 9:49:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545642
PE
3528
FACILITY_ID
FA0003788
FACILITY_NAME
SHERWOOD PLAZA
STREET_NUMBER
5757
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5757 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" I <br /> . l <br /> R,ESNA Industries Inc. <br /> i <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1993 <br /> F <br /> To reduce the potential for cross contamination between wells, the monitorings will take la <br /> g place <br /> in order from the least to most contaminated, if known. Wells containing free product will be <br /> monitored last. Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to develop a groundwater contour map ' <br /> for the project site. Groundwater flow will be estimated to be perpendicular to equipotential <br /> lines drawn on the map. } <br /> 1 <br /> I <br /> 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br /> Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner: F <br /> 1 <br /> VOLUME OF SCHEDULE 40 PVC PIPE <br /> Diameter (inches) I.D. {inches) Volume . <br /> Galliinear feet <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br /> VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING AND HOLE.'. <br /> Hole Volume/Linear Feet of Hole Nominal VolumelLinear Feet 'o#:; <br /> Diameter Casing Annular S.pecet . : <br /> (inches) Gallons Cubic Feet (inches) Gallons Cubic Felt <br /> 7.25 2.14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0.37 2 2.55 0.34 <br /> 10.25 4.29 0.57 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 4 5.30 0.71 <br /> r <br /> Annular volumes will be multiplied by 30%to account for porosity of filter peck. f <br /> QAQcIM.FNL g <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.