My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5757
>
3500 - Local Oversight Program
>
PR0545642
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:56:44 AM
Creation date
5/6/2020 9:49:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545642
PE
3528
FACILITY_ID
FA0003788
FACILITY_NAME
SHERWOOD PLAZA
STREET_NUMBER
5757
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5757 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> r <br /> RESNA Industries Inc. � <br /> J <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 ` <br /> measurements will be taken both before and after purging of each well casing volumes. Once <br /> the well is purged and indicator parameters have stabilized, a sample will be collected after the <br /> water level approaches 80 percent of its initial elevation. Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and enough water is present to fill <br /> sample containers. <br /> t <br /> Cross contamination from transferring pumps (or bailers) from well to well will be avoided by <br /> utilizing dedicated equipment. Where this is not feasible, thorough cleaning of equipment will <br /> be performed between sampling rounds. Sampling will proceed from the least contaminated to <br /> the most contaminated well, if information is available before sample collection, or if it is <br /> indicated by field evidence. Where several types of analysis will be performed for a given well, <br /> individual samples will be collected in the following order: <br /> 1. Volatile Organics <br /> 2. Purgeable Organic Carbon <br /> 3. Purgeable Organic Halogens <br /> 4. Total Organic Carbon i <br /> S. Total Organic Halogens <br /> 6. Extractable Organics <br /> 7. Total Metals <br /> 8. Dissolved Metals <br /> 9. Phenols <br /> 10. Cyanide <br /> The specific analytical methods be utilized for the common volatile/se mi volatile to analyses are <br /> shown on Table 2. <br /> Groundwater samples will be collected with a teflon bailer with bottom emptying device. <br /> Duplicate samples will be transferred to vials or containers that meet Regional Board <br /> specifications (Table 1). Groundwater from the bailer will be transferred to the sample container <br /> r <br /> QAQctovx.FKL 13 <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.