My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7303
>
3500 - Local Oversight Program
>
PR0545644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:01:24 AM
Creation date
5/6/2020 9:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545644
PE
3528
FACILITY_ID
FA0003814
FACILITY_NAME
TOSCO CORPORATION #30878*
STREET_NUMBER
7303
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07736021
CURRENT_STATUS
02
SITE_LOCATION
7303 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Underground Storage Tank Removal- Unocal Service Station No. 5421, Stockton, California <br /> December 12, 1997 <br /> total oil and grease (O&G) by Standard Method 5520E&F, chlorinated hydrocarbons by EPA Method <br /> 8240, semivolatile organics by EPA Method 8270, and the metals cadmium, chromium, lead, nickel, <br /> and zinc by ICRP. Soil samples collected from beneath the hydraulic lifts will be analyzed for Total <br /> Petroleum Hydrocarbons as hydraulic oil (TPHho) by EPA Method 8015 (Modified) and BTEX. <br /> Reporting and Scheduling <br /> GSI anticipates initiating field activities in January 1998. After completion of the field work and <br /> laboratory analyses, the data will be evaluated and assembled into a report. Included in the report will <br /> be soil analytical results, chain-of-custody documentation, a summary of field observations, assessments, <br /> and conclusions. This report will be submitted to the SJCEHD within 6 to 8 weeks of receiving <br /> analytical results from the laboratory. <br /> PROJECT STAFF <br /> Mr. Stephen Carter, a Registered Geologist in the State of California (R.G. No. 5577), will provide <br /> technical oversight and review of the work. Mr. Greg Gurss, Project Manager, will supervise and direct <br /> field and office operations. GSI employs a staff of geologist, engineers, and technicians who will assist <br /> with the project. <br /> If you have any questions or comments, please call us in our Dublin office at (510) 551-7555. <br /> Sincerely, <br /> GeoStrategies <br /> +Clde . Galantine RED <br /> GFQIp <br /> Project Geologist Q���Q`�E cggJ`�J'.► <br /> Na.5577 <br /> tephen J. Carter N <br /> Senior Geologist <br /> R.G. 5577 OF CAI—If <br /> Attachments: Figure 1. Vicinity Map <br /> Figure 2. Site Plan <br /> GeoStrategies Field Methods and Procedures <br /> GeoStrategies Site Safety Plan <br /> cc: Ed Ralston, Tosco Marketing Company <br /> Elizabeth Thayer, RWQCB - Central Valley Region <br /> 7743.01-1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.