1 <br /> Mr. Michael Collins <br /> October 7, 1993 <br /> Page 2 <br /> Field work for. the soil investigation described in the workplan dated, October 1, 1993 is <br /> scheduled to begin on-October 18, 19.93. If there are any foreseeable delays in obtaining the <br /> well installation permit, which may impair the scheduled work date, please contact me at (5 10) <br /> 748-5635. Also, if you have any questions regarding the contents of this letter, please do.not <br /> hesitate to call me. <br /> Sincerely, <br /> Matthew W. Hanko <br /> Associate Geoscientist <br /> Enclosure <br /> IW71CM Ac� ren Sm <br /> Na �y <br /> ENVIRONMENTAL ENGINEERING CORPORATION W mcycled Raper <br />