My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 8
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
WORK PLANS_FILE 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:20:34 PM
Creation date
5/6/2020 2:09:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 8
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Proposed CPT/HydroPunchTm Boring Locations <br /> Union Pacific Railroad Company <br /> Former Maintenance Facility <br /> Tracy, California <br /> Phase II Field Investigation Work Plan <br /> HydroPunch TIM Depth Rationale Location <br /> Location ft b s <br /> Assess groundwater in the area between wells MW-05A and MW-13A,where TEPH was not <br /> HP-01 30 detected and wells MW-09A and MW-10A where TEPH was detected at 370 and 430•g/L, Northwest of Engine House <br /> respectively. Depending on the results from this boring,additional stepout borings may be <br /> advanced. <br /> Assess TEPH plume north of well MW-09A,where TEPH concentration is 370 ug/L and well <br /> HP-02 30 MW-15A,where TEPH was not detected. Depending on the results from this boring,additional In the vicinity of Station House <br /> stepout borings may be advanced. <br /> Assess TEPH plume northeast of well MW-09A,where TEPH was detected at 370•g/L and <br /> HP-03 30 north of MW-14A,where TEPH was detected at 350•g/L. Depending on the results from this North of Engine House <br /> borinq,additional stepout borings may be advanced. <br /> Assess TEPH plume in the transition area between the source area and well MW-15A,where <br /> HP-04 30 TEPH was not detected. Depending on the results from this boring,additional stepout borings North of Engine House <br /> may be advanced. <br /> Assess TEPH plume in the transition zone between wells MW-15A,where TEPH was not <br /> HP-05 30 detected,and well MW-22A,where TEPH was detected at 170•g/L. Depending on the results Northeast of Engine House <br /> from this boring,additional stepout borings may be advanced. <br /> Assess TEPH plume in the area between wells MW-14A and MW-22A,where TEPH was <br /> HP-06 30 detected at 350 and 170•g/L, respectively. Depending on the results from this boring, Northeast of Engine House <br /> additional stepout borings may be advanced. <br /> Assess TEPH plume along the perimeter, between wells MW-12A and MW-15A,where TEPH <br /> HP-07 30 was not detected and well MW-22A,where TEPH was detected at 170•g/L. Depending on the Northeast of Engine House <br /> results from this boring,additional stepout borings may be advanced. <br /> Assess TEPH plume along the perimeter in the transition zone and between the source area <br /> HP-08 30 and well MW-22A,where TEPH was detected at 170•g/L. Depending on the results from this Northeast of Engine House <br /> boring, additional stepout borings may be advanced. <br /> Assess TEPH plume southeast of well MW-08A, in which TEPH concentrations were 8,900 <br /> HP-09 30 •g/L. Depending on the results from this boring, additional stepout borings may be advanced. South of Engine House <br /> Assess TEPH plume southwest of well MW-08A,in which TEPH concentrations were 8,900 <br /> •g/L,and downgradient of former TPCA pond excavation. Depending on the results of the data <br /> HP-10 30 from this boring, additional stepout borings may be advanced around the downgradient Southwest of Engine House <br /> perimeter of the former TPCA pond excavation area, or south of the railroad tracks. <br /> Tables 1-3(12-30-08).xis ARCADIS Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.