My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br /> (FACILITY NAME: b�zf� ADDRESS: 05 Gm <br /> FACILITY ID# OO Q�-�4 TANK# Z UL# TANK MODEL/MATERIAL: X <br /> CAPACITY: PRODUCT: UL W6 R.E.H.S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> I <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> I I <br /> / 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> I <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> I <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> I <br /> VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRS/MIN: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> PIPING INSPECTIONS <br /> y 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br /> J (�� 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> ISI��(1 ✓ 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> I <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> Pi11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> -7 P 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> ` 3 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br /> 7 4. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> 1 ��l15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) � <br /> ( I <br /> i <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> + � 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> /r 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> r- 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> / 24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> COMMENTS.1,/�K(�iAy C� [ L./G2 <br /> EH23-006 9/95 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.