My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14 43 FR COhITA I N�1ENT =;/_LUT I OPIS214 542 5020 TO 9-15108958426 P. 10/20 <br /> • 0• <br /> section Safetx <br /> bulletin 3 <br /> date --2/1/97. <br /> page _ 3 of 6__ <br /> The safety observer is not to enter the tank for rescue if the man can get <br /> out himself. <br /> If physical rescue is required, the safety observer is to: <br /> A. Summon the backup man (sound air horn if necessary) . DO NOT ENTER <br /> the tank without back-up present, <br /> B. Attempt to pull the technician toward the entry hole by means of <br /> the lifeline. <br /> C. Attach lifeline to safety harness. <br /> D. Put on the SCBA and test operation, <br /> E. Enter the tank and assist in the rescue and removal of the man, <br /> after the stand-by person is present at the tank entry hole. <br /> 2. Remove All Possible uct <br /> Use a hand pump or approved flammable fluid pump to remove as much <br /> product as possible. No more than 1" of product should be in the tank <br /> prior to ventilation. Remove submersible pump if it is accessible. <br /> 3. Start Ventilation <br /> Connect an approved air mover to exhaust air from the fill pipe or <br /> other pipe or hose within 12" of tank bottom. The air mover must be <br /> grounded when in use. Extend exit point of exhaust at least 6' above <br /> grade. <br /> Continue to ventilate until test with the combustible gas meter <br /> indicates the LEL is less than 10Z within 12" of tank bottom. Remove <br /> fill pipe to check. This can take between 2 and 24 hours depending on <br /> the amount of product left in the tank. <br /> If tank lines are manifolded, the line to the tank to be entered might <br /> have to be broken and blanked off to isolate the tank and allow <br /> defuming of the tank. <br /> 4. Cut Ent., Hole <br /> Cut entry hole only after tests confirm the vapor level within 12" <br /> of the tank bottom is less than 20% of the LEL. Use only an air <br /> powered saw, The minimum hole size to facilitate rescue if required is <br /> 24" x 24", <br />
The URL can be used to link to this page
Your browser does not support the video tag.