Laserfiche WebLink
04/26,99 15: 11 FAX 425 251 4732 BARGHAUSEN 2005 <br /> 04/26/1999 07;11 7146705420 EHS ARCO LA PALMA PAGE 07 <br /> C. Record the inspection observations on the Daily Visual Monitoring Log <br /> (Form APPC-765: attached) <br /> 4. RESPONSE PLAN <br /> OPERATOR RESPONSIBILITIES <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an alarm is activated, station personnel are to immediately: <br /> a_ Contact ARCO Maintenance or its designated agent by using the <br /> telephone number previously provided. <br /> b. If any visible indications of petroleum products or vapors are noticed <br /> call 911_ <br /> C. Make an entry in the Recordable Discharge Log(Form APPC-765-1: <br /> attached) indicating the action taken <br /> d• Complete the Recordable Discharge Log when and as the source of <br /> the alarm is known. <br /> ARCO RESPQNSIBJL-r TES <br /> B. METHOD OF-REMOVING AN UNAUTHORIZED RELEASE FROM THE <br /> SECONDARY CONTAINMENT <br /> a. . Any unauthorized release into the secondary containment system of a product <br /> tank will be removed-by pumping. Uncontaminated product may be returned <br /> to the tank. Contaminated product may be returned to the refinery to be <br /> recycled or may be disposed of following procedures in accordance with <br /> California Health Safety Code requirements. <br /> b. ARCO Maintenance will be responsible for authorizing and selecting <br /> contractors for the work to be performed. <br /> 5. TRAI NG. . <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, traiui.nb <br /> needed for the operation of the tank system and monitoring equipment includes: <br /> How to: <br /> Take tank level measurements <br /> Read dispenser meters <br /> Inspect equipment <br /> - Recognize warning signs: dispenser hesitations,meter spins and odors <br /> Mauually close dispenser impact valve <br /> Replace dispenser filters <br />