Laserfiche WebLink
• Based on our experience at other, equivalent sites, an operation duration of 1 to 2 years as <br /> reasonable This system would be designed to address all the on-sate and nearby off-site <br /> impacted soil within the vadose zone which represents approximately all of the known area of <br /> impacted soil an the vadose zone on the Property If dramatic fluctuations an groundwater <br /> elevations continue, the ability of the system to remediate the near groundwater lower vadose <br /> zone will be effected This groundwater effect could be controlled using a groundwater <br /> extraction system to suppress the groundwater surface <br /> IW <br /> I <br /> r <br /> 1110led3 19 <br />