Laserfiche WebLink
` SB/MW # SI.3 <br /> SOIL DRILLHV"G LOG # D- 24942 <br /> PaFF'6 <br /> L� Page J of I <br /> Geolo st Matt Hank <br /> � z <br /> SIGNATURE OF GEOLOGIS <br /> j PROJECT N&B Stockton LOCATION 4555 North Pershing,Stockton,CA <br /> TOC ELEVATION (MSL) DATE(S) 10/18/93 TOTAL DEPTH 2601 <br /> MONITORING DEVICE OVM SCREENED INTERVAL NIA <br /> SAMPLING METHOD Probe Drive Sampler SUBCONTRACTOR&EQPT GreggDrillin obile B-61 <br /> PERCENTAGE ORDER (GRAVE.L,SAND,SILT,CLAY) MEMO =First Water <br /> MEMO <br /> Borehole Abandonment/ <br /> o [ -8 Well Construction <br /> 'o Soil Description c- Details <br /> aColor,Texture,Moisture,Etc <br /> A vi v`4i vi U <br /> j 0-0 75'Asphalt/Concrete <br /> } No soil samples collected from surface to 22 feet below <br /> 2-5 Bade <br /> 50 <br /> 75 <br /> I <br /> 100 <br /> Borehole <br /> diameter is <br /> 1-uich <br /> 125 <br /> 150 <br /> 175 <br /> —200 Portland <br /> Cement <br /> 22.5 22 0' -26 0'Silty Sand (0,70,30,0),brown(10YR4/3),fine SM <br /> 50608 sand,poorly graded,medium dense,slightly moist to dry <br /> 0 <br /> 17 —250 50609 <br /> @ 25 8'sod saturated. 2601 <br /> t%EER <br /> of <br /> R S. <br /> ,Y&B,12Ml9J,UU P U <br /> SIGNATURE OF FIELD SUPERVISOR AND REVIEWER SIGNATURE OF REVIEWER NO I5fi4 <br /> e'�P6I <br /> TITLE TITLE 11C. T«ΡA ��� <br />