My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009101
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4555
>
3500 - Local Oversight Program
>
PR0545652
>
ARCHIVED REPORTS_XR0009101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 3:48:24 PM
Creation date
5/6/2020 3:32:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009101
RECORD_ID
PR0545652
PE
3528
FACILITY_ID
FA0003638
FACILITY_NAME
JEMCO VENETIAN CARDLOCK
STREET_NUMBER
4555
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017001
CURRENT_STATUS
02
SITE_LOCATION
4555 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laboratory Analysis <br /> Soil vapor, soil, and groundwater samples were analyzed on site by Monroe Laboratories, <br /> Inc , a Department of Health Services (DHS)-certified mobile laboratory All samples were <br />' analyzed for BTEX, as well as TPH gas by EPA Methods 8020 and EPA Modified <br /> Method 8015, respectively fn addition to providing numerical results, the laboratory also <br /> provided chromatographs for each positive result <br /> ISite Cleanup/ Residual Management <br /> On completion of soil and groundwater sampling, boreholes were sealed in place with a <br /> grout mixture of Type II cement with 4% pure sodium bentonite The grout was pumped <br /> through a 1-inch diameter grouting tube positioned at the bottom of each borehole All <br /> investigation-derived residuals were containerized in labeled, 55-gallon drums and left at <br /> the former Cardlock gas station site for disposal by Boettcher Western Properties III, Ltd <br /> Quality Assurance - Quality Control <br /> QA/QC procedures included <br /> IStandard laboratory instrument calibration, consistent with state and federal <br /> standards. <br /> • All downhole sampling equipment was steam cleaned and washed in a trisodium <br /> phosphate (TSP) solution at the beginning of the day and after removal from each <br /> borehole <br /> • Background air samples were collected and evaluated with the HNu meter to <br /> comply with the site Health and Safety Plan <br /> • All samples were collected under the supervision of a registered civil engineer <br />' p yob%940549kapon doc 5 940549 00 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.