Laserfiche WebLink
' I&FIED PROGRAM CONSOLIDATED FOO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 3 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> 'LAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-77 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br /> I. FACILITY INFORMATION _ <br /> FACILITY ID#(Agency Use Only) T 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> ARCO 06080 <br /> BUSINESS SITE ADDRESS 85 E LOUISE AVENUE 103. BUSINESSSITECITY LATHROP 01 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> _by the a ui ment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed b ualified personnel.[23 CCR§2632.2634,2638,26411 <br /> 9 _ .._._...._.._. ........_..._ .......... .. ............_..-.......................Y ......... ......... 9........____..._._.._.......................................P ........Y..9............ . P.............__._111...1.._......-..__... <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER( p �)� 490-3(Specify): 490-3 <br /> Qb <br /> b. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§2632,26341 490-4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check <br /> that <br /> apply) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 490-8. <br /> 490-9. MODEL#(S1, 794380-302; 490-10. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 794380-303 91 tank only) <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§26431 49x11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490.13. <br /> IN-TANK PROBE MANUFACTURER: 49114. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> 490-I8. <br /> PROGRAMMED TESTS: .......... ❑._a..0.1 g.P-h:.............................._0 b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19.............. <br /> _' <br /> ........ __........._.._.__......_..............-..._._..................................................................... <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1] 490-20. <br /> __........-_..........._..__.............._..............._.................-...._............................................................_...._............................................................................................................._...-..............................................._..............._................_..............._...................................................._.................._._........................................_............................................... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 491 22. <br /> --....._.............._......._......_....................--_...................-..-_....................._........................................._.._....................-............................................................................................................................................_............................................._......_...._....................................................................................................................._1111._................11..................11... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490.23 <br /> 490-24. <br /> TEST FREQUENCY: ❑ .a:.ANNUALLY ❑ b.BIENNIALLY ❑..._c.OTHER(Specify): apo-zs:....4...... <br /> ....................................................._.................... . <br /> ❑ 99.OTHER(Specify): ago-z6. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all <br /> thatapply) <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-11, <br /> 123 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED [-I d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-323 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.35. <br /> __ .._............_._..__.............................................. --_... _ _11__11.._ ..................................__......---..._.........._.._..__.........._._................ <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRIC"I-S OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S):V8 orle88 490-37. MODEL#(S): LD2000 490-38. <br /> ..._......................................_......__._...-_.._..... ...........................__....._.......----........................._...... ......_.._......_.......... <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: [3a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49144. <br /> ...................._........................................................................---.....................__.........................................................................._............._......._......._..._._....._......._..._._...._..._.........................._........................._........................................................................................................_.._..................................................._._.............................................. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c. (Specify)P fYOTHER S 4) 490.447.7. <br /> Q90-46. <br /> r] 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049. <br /> "Allowed for monitor n of unburied emer enc enerator fuel i in onl er HSC 25281.5 3 <br /> - -................... .- _.............................................._.........................._._...................._...................._.................................._..............................................................................................................8............................................8........%.8.................................P..P.....8..........XP.....................�..................... )5111)1.......................... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] 490-50. <br /> _._..................._..........-......................................__.--.......-.--._-....................... ......._.._... ..........................................................................................._.............._...._......._..........................._.........................._............_.................................__..............._......._..._..................._........_...... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ 99.OTHER(Specify) -490-52. <br /> 4941 <br /> �a a/ <br /> Arco 06080,Belshire Environmental Services Page 1 of 6 <br />