Laserfiche WebLink
UMNIED PROGRAM CONSOLIDATED FOR . <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page I of 3) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. 490-2. <br /> Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br /> '° <br /> FACILITY ID#(Agency Use Only) I. FACILITY INFORMATION 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> ARCO 06080 <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY <br /> 85 E LOUISE AVENUE LATHROP 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> _by the eq> ment manufacturers'instructions,or annum whichever is more frequent.Such work must be performed by ualified�lersonnel.[23 SCR§2632,263±. 638,-2641] <br /> MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY ❑ 99.OTHER490-3a <br /> (Specify): 490-3b. <br /> III. MONITORING LOCATIONS - <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-4 <br /> [23 CCR§2632,2634] <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check <br /> he kali <br /> ® t apply) <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7• MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 0-90-9. MODEL#(S): 794380-302: 490-10. <br /> 794380-303(91 tank only) <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] � 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> f� ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> (Sp fY)� <br /> PROGRAMMED TESTS: ❑ a•0.1 g.p.h. [Ib.0.2 h. El c.OTHER490-18 <br /> __. _ g:p:...-..-..__..._..._----..___. (Specify): 490199. <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. { <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑-a. HOURS ❑ b.60 H0URS490-21. <br /> ❑ <br /> --.---.---.-..- -__ ._.. ..__. .....__.___._.._..-__.__..______...__..._.___.._.._.....___...-._. ._._....-...-_..._...._.____.._....___...._.___..__......_..__..___.............._. _.-.__._.-.._ 490-22.5.TANK INTEGRITY TESTING PER(23 CCR§2643 11 '•"•-'.-'490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY 490-24. <br /> ---._..._. _----_-_. El c.OTHER(Specify): 490-25. <br /> __.._.._..__...._..____..._.__.__.._.___... _._...-......___-._. _. <br /> ❑ 99.OTHER(Specify): --.490-z6. <br /> 490-27, <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS) (Check all <br /> ) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28 <br /> 123 CCR SECONDARY CONTAINMENT IS: a.DRY ❑ d.UNDER VACUUM 490-29 <br /> §2636] ® ❑ b.LIQUID FILLED ❑ c.PRESSURIZED <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-323 490-33. i <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S):V8 orless 490-37' MODEL#(s): LD2000 490-38. <br /> r <br /> 1:13.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h_LEAK TESTS.[23 CCR§26361 490-39 <br /> ELLD MANUFACTURERS : 490-40 490-x1 I <br /> ( ) MODEL#(S): 1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 19043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY 490-46. <br /> Q _- ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49(-47. <br /> ❑ 5.VISUAL PIPE MONITORING. - -- 490-48-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> _ •Allowed for monitor of unburied emergency enerator fuel R!in6 only per HSC 25281.5 _(3) <br /> El 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] - 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> El 99.OTHER(Specify) -- --- --- __-_ -__ _..__._ 490-52. <br /> 490-53. <br />