Laserfiche WebLink
'�__IE HAVED <br /> IFIED PROGRAM CONSOLIDATED <br /> UNDERGROUND STORAGE TANK UG f i 7 2008 <br /> MONITORING PLAN- (Page 1 of 3) <br /> FTYPEOF ACTION ® 1.NEW PLAN El2.CHANGE OF INFORMATION PERP,117/SERVICES 490-I <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2- <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490.2a. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1-7 <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 06080 3 <br /> BUSINESS SITE ADDRESS 85 E LOUISE AVENUE 103 BUSINESS SITE CITY 104 <br /> LATHROP <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annum,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638_26411 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER S eci 490=3$ <br /> ( p �)' 490.36. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634) 490-4 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hal a k" <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 490-8 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794380-302; 490-10794380-303(91 tank only) <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§26431 490-11 <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14 MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 ' <br /> PROGRAMMED TESTS: ❑ a.0.1Bp h. ❑ b.0.2 h. ❑ c.OTHER490-19 II <br /> __.. g•p•. (Specify):P 'T)� ,.49019. _ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§264611 <br /> 490 20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MFG)[23 CCR§26451 TESTING PERIOD: Ela.36 HOURS El490 22 <br /> b.60 HOURS 490-2i <br /> ....__ ........... .._...____.._. _._ ..... _.._.-._._._ ._ ._._._._ _.... ............._.._._ ._..._.........._._ ,.,.... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643 11 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY El c.OTHER(Specify): 490 24 <br /> 4 <br /> _ _90-25 <br /> ❑ <br /> 99.OTHER(Specify): <br /> 490-26 <br /> 490.27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) har a k ly) o <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. <br /> 490-28 <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED 490-29 <br /> §2636] Q ❑ c.PRESSURIZED ❑ d.UNDER VACUUM r <br /> PANEL MANUFACTURER:Veeder Root 490-30 MODEL#: TLS-350 490-31 ] <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32 MODEL#(S): 794380-323 4`0-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35 !! <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 i <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 i <br /> _ _M_LLD_MA_NU_F_ACTURER(S).V0. orless 490-37 MODEL#(S>: LD2000 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S): 490-40 MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES [Ib.NO 490-44 <br /> ❑ <br /> _----...... _ _ _....._-.- ----- <br /> 4.PIPE INTEGRITY TESTING. - -..--- 4990450-45. .. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49490-46 <br /> 901 6 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048048 <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED` 490.49 <br /> - _Allowed for monitoring of unburied emer eB ncy generator fuel piping only per HSC§2528L55(b)(3� <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.(23 CCR§2636(a)(3)] 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-s1- <br /> ❑ - <br /> 99.OTHER(Specify) 490-52. <br /> 490-53. <br /> Arco 06080,Belshire Environmental Services Page I Of 6 <br />