Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED F , <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page I of 3) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 06080 3 <br /> BUSINESS SITE ADDRESS 85 E LOUISE AVENUE 103 BUSINESS SITE CITY LATHROP 104 <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed b�qualifiedpersonnel [23 ccR§z63z,z63a,263s z6al] <br /> MONITORING EQUIPMENT IS SERVICED <br /> Q ® 1.ANNUALLY ❑ 99.OTHER(Specify): 49�o-3b <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ChQk all <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 4f0.8 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 4`90-9. MOQFL#(S): 794380-302: . 490-10 <br /> 794380-303(91 tank onIV) <br /> [Ell 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] 490-11 <br /> PANEL MANUFACTURER: 490-12 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 190-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18 <br /> g•P• g•P• (Specify): 490.19 <br /> ❑ '3 MONTHLY STATISTICAL INVENTORY RECONCILIATION 23 CCR§2646 11 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490 9202-21 <br /> --- -....._......... _........_.__.._......_._._.. -_ ..._._..--...._.__...__... -- _.._........ ..........._......_..._.__..... -......._...._...._...__........_......-_.._...........--...... <br /> .. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643 1] 490-23 <br /> FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci ago-z4 <br /> TEST FRE <br /> Q (Specify): a90-zs <br /> ❑ <br /> 99.OTHER(Specify): 490-26 <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) atak-11 <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28 <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED El c.PRESSURIZED El d.UNDER VACUUM 490-29 <br /> §2636] Q <br /> PANEL MANUFACTURER:Veeder Root 490-30 MODEL#: TLS-350 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32 MODEL#(S): 794380-323 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR426361 <br /> MLLD MANUFACTURER(S):Va orless 490-37. MODEL#(S): LD2000 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39 <br /> ELLD MANUFACTURER(S): 490-40 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: Ela.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43 <br /> i <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49044 <br /> El4.PIPE INTEGRITY TESTING. 49045 <br /> TEST FREQUENCY:__ ❑ a.ANNUALLY El b.EVERY 3 YEARS El c.OTHER(Specify) 4907-46 <br /> ❑ 5.VISUAL PIPE MONITORING. -' 49048 <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> ._......................._........_. ......_-_.-_-._.._.................I.._..._............_._._._._._._.._..__..._'Allowed for monitoring 2f unburied smerEencenerator fuel piping c nlyper HSC 25281 S(bZ(3).,__. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 490-50 <br /> -- -......-............--._.._._.__ _...__. - ._.._......_ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51 <br /> ❑ <br /> 99.OTHER(Specify)- 4900-53.z <br /> -53. <br /> Arco 06080,Belshire Environmental Services Page 1 of 6 <br />