My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
129
>
1600 - Food Program
>
PR0528368
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 10:04:35 AM
Creation date
5/7/2020 8:41:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0528368
PE
1624
FACILITY_ID
FA0019155
FACILITY_NAME
STARBUCKS COFFEE #11830
STREET_NUMBER
129
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
22208027
CURRENT_STATUS
01
SITE_LOCATION
129 S UNION RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LUTRON SERVICES System Layout <br /> SERVICE TITLE <br /> SERVICE DESCRIPTION <br /> (MODEL NUMBER) General Notes <br /> QTY .. <br /> ,W <br /> THE QUANTITY OF SERVICES BELOW ARE TO BE INCLUDED AS PART OF THIS PROJECT'S SCOPE OF WORK AND SPECIFIED INTO THE WRITTEN SPEC 1. This layout is for system schematic <br /> DOCUMENTS purposes only.Contractor shall locate, <br /> install,and wire equipment according <br /> PRE-STARTUP SERVICES to Lutron installation and specification <br /> ONSITE PRE-WIRE VISIT AN ONSITE VISIT WITH THE ELECTRICAL CONTRACTOR TO DISCUSS LOGISTICAL CONSTRUCTION CONSIDERATIONS INCLUDING THE documents. <br /> (LSC-PREWIRE) WIRING AND MOUNTING OF SYSTEM DEVICES,THE CONSTRUCTION SCHEDULE,AND LUTRON DOCUMENTATION. QUANTITY DICTATES 1a. Load Interfaces(XPJ,BMJ,BMF, <br /> THE NUMBER OF VISITS PURCHASED. PHPM,etc.)are shown near their <br /> SYSTEM&NETWORK A CONSULTATIVE VISIT WITH THIRD PARTY INTEGRATORS TO CONFIRM THE SPECIFIED SEQUENCE OF OPERATION AND DISCUSS respective loads,however actual <br /> installation location can vary. <br /> INTEGRATION INTEGRATION PROCEDURES NEEDED IN ORDER TO INTEGRATE WITH THE LUTRON EQUIPMENT.THIS MAY INCLUDE ANY OF THE ©2017 STARBUCKS COFFEE COMPANY <br /> CONSULTATION FOLLOWING THIRD PARTY SYSTEMS: BMS, BAS, IT, NON-LUTRON SHADES, BACNET,AV,OR ENERGY DASHBOARDS. 11). If the Lutron Sensor Layout and <br /> (LSC-INT-VISIT) tuning service has been purchased, <br /> then daylight and occupancy STARBUCKS COFFEE <br /> STARTUP SUPPORT SERVICES sensors are placed by Lutron. <br /> (THESE SERVICES ARE ADDITIONAL TO YOUR SPECIFIED STARTUP BASED ON YOUR REQUIREMENTS) 2. See Cover Sheet and One Lines for COMPANY <br /> additional information. <br /> ONSITE SYSTEM UP TO 8 CONTIGUOUS HOURS OF SYSTEM PROGRAMMING DELIVERED BY A LUTRON SERVICES REPRESENTATIVE.THE SYSTEM WILL 2401 UTAH AVENUE SOUTH <br /> PROGRAMMING BE PROGRAMMED PER AN APPROVED SEQUENCE OF OPERATION.QUANTITY DICTATES THE NUMBER OF 8-HOUR BLOCKS Legend SEATTLE, WASHINGTON 98134 <br /> (8-HOUR) PURCHASED. <br /> (LSC-OS-PROG8-SP) MS-OPS5M-WH(2) (206) 318-1575 <br /> ONSITE SYSTEM UP TO 4 CONTIGUOUS HOURS OF SYSTEM PROGRAMMING DELIVERED BY A LUTRON SERVICES REPRESENTATIVE.THE SYSTEM WILL PJ2-2B-GWH-L01 (CW-1-WH) THESE DRAWINGS AND SPECIFICATIONS ARE <br /> PROGRAMMING BE PROGRAMMED PER AN APPROVED SEQUENCE OF OPERATION.QUANTITY DICTATES THE NUMBER OF 4-HOUR BLOCKS ® (2) CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> (4-HOUR) PURCHASED. PJ2-2BRL-GWH-L01 (CW-1-WH) <br /> (LSC-OS-PROG4-SP) (8) PROPERTY OF STARBUCKS CORPORATION, <br /> WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> REMOTE SYSTEM UP TO 4 CONTIGUOUS HOURS OF SYSTEM PROGRAMMING DELIVERED BY A DEDICATED FACTORY CERTIFIED REMOTE TECHNICIAN LRF2-DCRB-WH(2) THIS WORK. THEY SHALL NOT BE <br /> PROGRAMMING EITHER VIAA REMOTE NETWORK CONNECTION OR WITH THE ASSISTANCE OF AN ELECTRICAL CONTRACTOR OVER THE PHONE.THE REPRODUCED IN WHOLE OR IN PART), SHARED <br /> (4-HOUR) SYSTEM WILL BE PROGRAMMED PER AN APPROVED SEQUENCE OF OPERATION.QUANTITY DICTATES THE NUMBER OF 4-HOUR LRF2-OCR2B-P(3) ( ) <br /> WITH THIRD PARTIES OR USED IN ANY MANNER <br /> (LSC-RMT-PROG4-SP) BLOCKS PURCHASED. PHPM-PA-120-WH(2) ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> ONSITE SCENE&LEVEL AN ONSITE VISIT WITH THE SPECIFIER OR CUSTOMER REPRESENTATIVE TO REVIEW THE DESIGN INTENT, FINE-TUNE THE SCENE PROJECT WITHOUT THE PRIOR WRITTEN <br /> TUNING LEVEL PROGRAMMING,AND MAKE ADJUSTMENTS TO TIMECLOCKS. l�l HJS-0-FM(1) CONSENT OF STARBUCKS CORPORATION. <br /> (LSC-AF-VISIT) MRF2S-6ND-120-GR(2) THESE DRAWINGS AND SPECIFICATIONS ARE <br /> ONSITE AN ONSITE WALKTHROUGH WITH FACILITY REPRESENTATIVES OR PROJECT COMMISSIONING AGENTS TO DEMONSTRATE THAT THE INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> PERFORMANCE-VERIFIC SYSTEM FUNCTIONALITY MEETS THE DESIGN INTENT.THIS MAY INCLUDE ANY OF THE FOLLOWING ONSITE ACTIVITIES— imr RMJS-16R-DV-B(1) PROTOTYPICAL STARBUCKS STORE (WHICH IS <br /> ATION WALKTHROUGH CONSULTATION/TRAINING DEMOS, FUNCTIONAL TESTING ASSISTANCE,OR INVENTORY OF LUTRON EQUIPMENT. SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> (LSC-WALK) <br /> ON RMJS-5R-DV-B(1) NOT REFLECT ACTUAL SITE CONDITIONS. <br /> RMJS-8TN-DV-B(6) NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> POST-STARTUP SERVICES M NOR LIABILITY TO THE OTHER (EXCEPT STATED <br /> CUSTOMER-SITE A VISIT TO TEACH SYSTEM USERS HOW TO OPERATE AND MAINTAIN THE LIGHTING CONTROL SYSTEM. ABOVE) UNTIL A WRITTEN AGREEMENT IS <br /> SOLUTION TRAINING FULLY EXECUTED BY BOTH PARTIES. <br /> (LSC-TRAINING-SP) <br /> SYSTEM OPTIMIZATION AN ONSITE CONSULTATIVE VISIT TO IDENTIFY AND IMPLEMENT LIGHTING CONTROL ADJUSTMENTS TO SAVE ADDITIONAL ENERGYAND ARCHITECT OF RECORD <br /> (LSC-SYSOPT-SP) CREATE A MORE PRODUCTIVE WORK ENVIRONMENT. <br /> mcg architecture <br /> MAINTENANCE & SUPPORT SERVICES o • <br /> UC U C <br /> (n 2� — <br /> SOFTWARE PROVIDES COMPATIBILITY TESTING RESULTS OF QUANTUM WITH OPERATING SYSTEM PATCHES AND WEB BROWSER UPDATES. > <br /> MAINTENANCE INCLUDES AN ELECTIVE FREE SOFTWARE UPGRADE LICENSE. a) <br /> � U <br /> AGREEMENT <br /> c <br /> (LSC-SMA-SP) <br /> COMMERCIAL SYSTEMS A 2-YEAR SYSTEM WARRANTY PROVIDING 100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A 111 Pacifica,Suite 280, Irvine,CA 92618 <br /> 2-YEAR LIMITED FIRST-AVAILABLE RESPONSE TIME. P:949.553.1117 F:949.474.7056 <br /> WARRANTY <br /> (LSC-B2) <br /> ENHANCED SILVER YEARS 1-2-100% REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A FIRST-AVAILABLE RESPONSE <br /> (LSC-E8S) TIME;YEARS 3-5-50%PARTS ONLY COVERAGE;YEARS 6-8-25%PARTS ONLY COVERAGE. ACTESr�,~QRpFES1.pN�tit11 <br /> ENHANCED GOLD YEARS 1-2-100% REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A72-HOUR RESPONSE TIME AND AN rr��c��c�LAV I,C �Fy2i2 <br /> ENGINEERING <br /> (LSC-E8G) ANNUAL(1-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT;YEARS 3-5-50% PARTS ONLY COVERAGE;YEARS 6-8-25%PARTS o� 9G- jj <br /> ONLY COVERAGE. 3371 Olcott Street 15130 z <br /> Santa Clara,CA 95054 1 <br /> ENHANCED PLATINUM YEARS 1-2-100% REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A24-HOUR RESPONSE TIME AND AN Ez l <br /> (LSC-E8P) ANNUAL(1-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT,YEARS 3-5-50% PARTS ONLY COVERAGE;YEARS 6-8-25%PARTS ph:(408)522-5255 p <br /> ONLY COVERAGE. fx:(408)522-5260 22 9 <br /> info@acies.net tt1 l FCTR%G �� r <br /> SSILVER UPPORT PLANTECHNOLOGY AN ANNUAL <br /> AILABRE ONSITE OR ICE PLAN AT COVES100%RESPONSE TIME.REPLACEMENT PARTS AND 100% LUTRON DIAGNOSTIC LABOR WITH A Copyright c 2019 11111 Opti <br /> pY 9 O <br /> (LSC-SILV-IW) <br /> GOLD TECHNOLOGY AN ANNUAL SERVICE PLAN THAT COVERS 100% REPLACEMENT PARTS AND 100% LUTRON LABOR WITH A 72-HOUR ONSITE OR REMOTE <br /> SUPPORT PLAN RESPONSE TIME.ALSO INCLUDES AN ANNUAL(1-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT EACH YEAR. <br /> (LSC-GOLD-IW) <br /> PLATINUM AN ANNUAL SERVICE PLAN THAT COVERS 100% REPLACEMENT PARTS AND 100% LUTRON DIAGNOSTIC LABOR WITH A 24-HOUR <br /> TECHNOLOGY SUPPORT ONSITE OR REMOTE RESPONSE TIME.ALSO INCLUDES AN ANNUAL(1-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT EACH YEAR. <br /> PLAN <br /> (LSC-PLAT-IW) <br /> PREVENTIVE SCHEDULED MAINTENANCE VISIT TO PERFORM PREVENTIVE MAINTENANCE, MINOR PROGRAMMING,AND CONDUCT SYSTEM W <br /> MAINTENANCE VISIT(S) TRAININGS.QUANTITY IS IN ADDITION TO ANY YEARLY VISITS SPECIFIED WITH AN ENHANCED WARRANTY OR TECHNOLOGY SUPPORT <br /> (LSC-SCH-MAINT) PLAN. <br /> PLEASE GO TO WWW.LUTRON.COM/SERVICES FOR FURTHER INFORMATION. <br /> W co <br /> T--I--1 <br /> •r EXTERIOR CAFE/BAR AREAr •CAFE/BAR AREA <br /> RF ' O n/ <br /> h - RF. RF. RFg_ • R� RF RP RF <br /> RF O <br /> 48 W of LED 0-10 30 W of LED ND 33 W of LED 0-10 (n <br /> o P12-2B-GWH-L01/PJ2-2BRL-GWH-L01/ PJ2-28-GWH-L01/PJ2-2BRL-GWH-L01/ 0 7 <br /> • 15076(4) 20784(3) 19027(3) U) <br /> . PJ2-2BRL-GWH-L01/PJ2-2B-GWH-L01 I CW-4-WH PJ2-2BRL-GWH-L01/PJ2-2B-GWH-L01 I CW-4-WH Project Name Z <br /> Starbucks#11830-Union&Yosemite 0�, <br /> Floor 1\RCP\WORKROOM-Control Station 005 �' Floor 1\RCP\WORKROOM-Control Station 005 6 LU O <br /> � <br /> 2 Button with Light Icon-Pico Keypad/2 Button with — 2 Button with Light Icon-Pico Keypad/2 Button with <br /> Raise/Lower and Light Icon-Pico Keypad/2 Button with Raise/Lower and Light Icon-Pico Keypad/2 Button with C) 7 <br /> Location: L <br /> Raise/Lower and Light Icon-Pico Keypad/2 Button with '� Raise/Lower and Light Icon-Pico Keypad/2 Button with Q 7 � � v <br /> Manteca,California L <br /> Light Icon-Pico Keypad Light Icon-Pico Keypad z Q <br /> 120/277V Scene 1 +Off/Scene 1 +Off with Raise/Lower/Scene 1 + Scene 1 +Off/Scene 1 +Off with Raise/Lower/Scene 1 + <br /> UJ <br /> Off with Raise/Lower/Scene 1 +Off Off with Raise/Lower/Scene 1 +Off Project Number: U O U � ) <br /> 4 gang backbox 4 gang backbox 2130"192.1.0 w w V J 7 <br /> 24V Power Supply <br /> o 120V 120V 120V Created by: Q z Z <br /> 0 <br /> Andrew Groeninger � 0 N <br /> To 24 Vive Device(s) <br /> ---------------------- -- --- - <br /> -- ------ To sheet 9 for additional inputs (L (L r <br /> J' RF RF � RF File Name: <br /> ';RF ® O Yosemite-Manteca, <br /> C s#11830 Union& <br /> ° To Network ° ' - - --To Vive Hub in Floor 1\RCP\WORKROOM < ° > -- --To Vive Hub in Floor 1\RCP\WORKROOM � ° > - - --To Vive Hub in Floor 1\RCP\WORKROOM <br /> ❑E Yosemite_Manteca,CA_11.14.19.1utd STORE #: 11830 <br /> Document Revision: PROJECT #: 37913-049 <br /> HJS-0-FM RMJS-8TN-DV-B RMJS-5R-DV-B RMJS-8TN-DV-B <br /> Floor 1\RCP\WORKROOM Floor 1\RCP\WORKROOM- Floor 1\RCP\WORKROOM- Floor 1\RCP\WORKROOM- PROFILE TYPE: CORE <br /> Hub 1 PowPak 0-10 V 003 PowPak Relay 001 PowPak 0-10 V 006 Date: November 14,2019 <br /> Starter Hub,flush-mount adapter and power supply PowPak Dimming Module with PowPak Relay Module PowPak Dimming Module with ISSUE DATE: <br /> 0-10 V Control. 0-10 V Control. PROGRAM MANAGER: M.DREBIKA <br /> Floor 1/RCP STORE DESIGNER: T.MARINIC <br /> LEED(D AP: N/A <br /> ZLNOT FOR CONSTRUCTION CHECKED BY: <br /> ACIES PROJECT#: 190478 <br /> ILUTRON ACIES PROJ. MANAGER: HT <br /> Lutron Electronics Co.,Inc. <br /> Lutron ACIES PROJ. SPECIALIST: TG <br /> 7200 Suter Road <br /> Coopersburg,PA 18036,USA Revision Schedule <br /> +1.610.282.3800 Fax: +1.610.282.1146 <br /> Rev Date By Description <br /> NOTE: <br /> THE PRESENTED LUTRON DIMMING CONTROLS DIAGRAM IS FOR REFERENCE <br /> ONLY. ELECTRICAL CONTRACTOR TO INCLUDE IN BID FULL COORDINATION <br /> WITH LUTRON ON PROVIDING DETAILED DIAGRAM AS WELL AS DETAILED BOM. <br /> ELECTRICAL CONTRACTOR INCLUDE IN BID ALL ADDITIONAL PARTS AND <br /> ACCESSORIES REQUIRED FOR COMPLETE AND OPERABLE SYSTEM. SHEET TITLE: <br /> LUTRON CONTACT IS: LUTRON <br /> Andy Groe r Kevin Smith CONTROL DIAGRAM <br /> Lutron Electronics <br /> s Lutron Electronics <br /> 513.913.7106 206.902.7323 SCALE: AS SHOWN <br /> Starbucks@lutron.com ksmith(a,lutron.com <br /> SHEET NUMBER: <br /> E-604 <br />
The URL can be used to link to this page
Your browser does not support the video tag.