My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 2:27:53 PM
Creation date
5/7/2020 9:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW 61 SO Overfill Materials <br /> Prevention Valves Valve body: Cast aluminum Important <br /> Float: Nitrile rubber,closed cell foam In order to prevent product spillage <br /> • The OPW 61 SO Overfill Prevention Valve from the Underground Storage Tank <br /> Valve:Aluminum (UST),properly maintained delivery <br /> is designed to prevent the overfill of equipment and a proper connection <br /> Seals:Viton" at the tight-fill adaptor are essential. <br /> underground storage tanks by providing Delivery personnel should be <br /> a positive shut-off of product delivery. Upper&lower Drop Tube:Aluminum managed and trained to inspect <br /> The shut-off valve is an integral part of the Plastic parts:Acetal delivery elbows and hoses for <br /> damaged and missing parts. <br /> • drop tube used for gravity filling.The OPW Hardware: Stainless steel They should always make certain <br /> • 61 SO allows easy Installation(without -- there is a positive connection <br /> between the adaptor and elbow.If <br /> breaking concrete)and requires no special Features delivery equipment is not properly <br /> • maintained,or the elbow is not <br /> manholes. ♦Simple, Easy and Quick Installation securely coupled to the adaptor,a <br /> The OPW 61 SO is a two-stage shut-off —no excavation or special manholes serious spill may result when the <br /> OPW 61 SO closes,causing a hazard <br /> valve.When the liquid level rises to about required. and environmental contamination. <br /> 95%of tank capacity,the valve mechanism ♦ Economical—costs a fraction of NOTE:The OPW 61 SO is designed <br /> is released,closing automatically with expensive,complicated and difficult- for use on tight-fill gravity drop <br /> applications only. Do not use for <br /> the flow.This reduces the flow rate to to-install valves. pressure fill applications. <br /> approximately 5 gpm through a bypass ♦Furnished Complete—supplied with <br /> valve.The operator may then stop the new upper and lower drop tubes, <br /> filling process and disconnect and drain mounting hardware and thorough <br /> the delivery hose.As long as the liquid instructions for quick job site time. <br /> exceeds the 95%level,the valve will ♦Completely Automatic Operation— ♦ Retrofits Directly—for both new and <br /> close automatically each time delivery no prechecks to perform, no resets, existing tanks with 4"fill risers. <br /> is attempted. and no overrides to be broken or abused. ♦Quick Drain Feature—automatically <br /> If the delivery is not stopped and the ♦No Pressurization of the Tank— drains hose when head pressure is <br /> liquid rises to about 98%of tank capacity, operates directly from liquid level. relieved. <br /> the bypass valve closes completely. No ♦Will Accept a Dipstick for Gauging ♦Best Flow Rate in The Industry* <br /> additional liquid can flow into the tank <br /> 'Test-witnessed by Bowser•Morner,Inc.,an independent laboratory.Results available upon request. <br /> until the level drops below a reset point. <br /> Models of the 61 SO are available Advantages of Overfill Prevention <br /> to meet virtually any UST application Compared to Overfill Warning Systems: <br /> including two-point,coaxial, poppeted ♦ Completely Automatic Operation ♦ Speeds Delivery Operations— <br /> coaxial and remote fill. Methanol —does not rely on the alertness or product flows unimpeded into the tank <br /> approved models are also available. speed of response of the delivery until the hose"kick"that accompanies <br /> The OPW 61 SO is approved by the attendant for certainty of overfill the valve shut-off provides a clear <br /> New York City Fire Department. prevention. signal that the liquid has reached the <br /> ♦ Keeps the Top of UST"Dry,"per shut-off level. <br /> (Approval#4902). EPA Requirements—eliminating g ♦ Simple and Inexpensive Installation— <br /> possible leaks at loose bung fittings in both two-point and coaxial fill <br /> and the need for double containment applications,no additional excavation, <br /> on vent lines. manholes or vent piping are required. <br /> ♦ Does Not Rely on Pressure in the <br /> Look for this label for UST to StopFlow faster fill <br /> authentic OPW EVR ow—allowing <br /> Approved products, times and reducing spill risk. <br /> OPW• <br /> Listings and Certifications NY City Fire <br /> Qand Listings Department P VV-� Certifications <br /> 61 SO Series Approval#4902 <br /> A DOVER COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.