Laserfiche WebLink
OPW Installation, Operation, and Maintenance Manual, Page 56 Executive Order VR-102-I <br /> STEP 20: PREPARE FILL RISER FOR VALVE STEP 23: CHECK INSTALLATION <br /> INSERTION Insert the drop tube all the way into the tank until the <br /> flange and gasket seat onto the top of the Face Seal <br /> IMPORTANT:Inspect the riser pipe for any foreign Adaptor. The float will swing out into the operating <br /> material. Over spray from tank relining or any position as it passes into the tank. <br /> internal burrs inside of pipe must be removed prior <br /> to installation. Failure to have an unobstructed riser <br /> pipe may prevent proper installation or operation of <br /> the valve. Thoroughly clean top of riser pipe. _` <br /> STEP 21: REMOVE ELASTIC BAND <br /> Remove the elastic band securing the float to the <br /> valve body. The float will move into an outward \ <br /> position. <br /> STEP 22: INSERT DROP TUBE <br /> Make sure the upper O-Ring gasket is under the <br /> flange of the inlet tube. Hold the float down against <br /> the valve body and slowly insert the drop tube <br /> overfill valve into the riser pipe. Do not force valve <br /> into the riser pipe. If any obstruction or foreign <br /> matter interferes with smooth insertion of the valve, <br /> the riser pipe must be , <br /> cleared. ` <br /> WARNING �r <br /> Failure to follow the <br /> assembly and <br /> installation instructions Figure 23 <br /> or use of excessive <br /> force to insert the OPW Make sure that the float is aligned along the length <br /> 71SO will VOID THE of the tank. The length of the tank can easily be <br /> WARRANTY± determined by locating other manholes or pump <br /> boxes that are installed around other tank fittings. <br /> Look into the drop tube and align the deflector with <br /> the length of the tank. <br /> \ CAUTION:No obstruction in the tank can be within <br /> 14"from the center of the riser pipe or the valve may <br /> not operate properly(See Figure 24). <br /> Figure 22 <br /> Difficulty in removing the existing fill tube(if there is STEP 24: ALIGN VALVE <br /> one)means there may be an obstruction in the riser Install the OPW Jack Screw Kit and a 4"NPT nipple <br /> pipe. Look for burrs, deformations, excess tank to lock the valve in place. Refer to the Installation <br /> lining material or other projections that may interfere Instructions supplied with the Jack Screw Kit. Instal! <br /> with easy insertion of the OPW 71 SO. The 71SO is the Rotatable Product Adaptor(Refer to Installation <br /> designed for insertion into schedule 40 pipe. If Instructions supplied with the Product Adaptor.) <br /> schedule 80 pipe has been used for the riser,the Make sure that the valve does not rotate while <br /> 71SO cannot be installed. If seamed pipe has been tightening the adaptor by observing the position of <br /> used,the internal weld bead may interfere with the the deflector. The valve must remain aligned <br /> OPW 71 SO and prevent installation. If the OPW along the length of the tank as in Step 23. <br /> 71SO won't slip in easily DON'T FORCE IT! Repeat this step as necessary to assure proper <br /> Damage to the valve may result if excess force is valve alignment. <br /> used. Examine the riser pipe carefully;determine <br /> the nature of the obstruction;take appropriate steps <br /> to remove it. <br /> OPW 71 SO Overfill Prevention Valve Page 10 <br />