Laserfiche WebLink
06EFFLfR-RYAN INC. GR Job # 1820_ 0072 <br /> D. Results of Testing/Servicing SWRCB,January 2006 <br /> Software Version Installed: 330 . 0 1 <br /> Complete the following checklist: <br /> Q Yes ❑ o Is the audible alarm operational? <br /> Q Yes ❑ No' Is the visual alarm operational? <br /> Q Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operatic ? <br /> Q Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communication equipment(e g modem)operational? <br /> ❑ N/A <br /> Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down I the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shutdown?(Check all that apply) <br /> ❑ Sump/Trench Sensor, ❑ Dispenser Containment Sensor.Did you confirm positive shutdown due to leaks and sensor <br /> failure/disconnection? Yes; ❑ No. <br /> Ej Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> ❑ N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm bigger? 90 % <br /> Q Yes ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes Q No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) []Product; []Water. If <br /> yes,describe causes in Section E,below. <br /> Q Yes ❑ No* Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> Yes No' I Is all monitoring equipment operational per manufacture's specifcations? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Dispenser 3/4 794380-208 sensor failed . Changed out sensor; tested and <br /> passed. <br /> Site is equipped with 794380-304 Veeder Root sensor in secondary <br /> annular spaces (Tested all High and Low alarms) , Site is also equipped <br /> with a Veeder Root model#794380-208 in the Vent sump, All sensor test <br /> and confirmed operational . <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> I <br />