Laserfiche WebLink
®&MER-RYAN INC. GR Job# 1820- 0072 <br /> SWRCB,January 2006 <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed d in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist <br /> ,10 Yes ❑ o I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes ❑ No* Was accuracy of system products level readings tested? <br /> 0 Yes ❑ No' Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No' Were all probes reinstalled propedy? <br /> 0 Yes 1 ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> n e on below,describe ow an when asedeficiencies ware or V411 be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> ❑ es ❑ o or equipment start-up or annus equrpmen ce ca on,was a leak simulated verrfy LLD performance?(check a <br /> ❑ N/A that apply) Simulated leak rate: [] 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes [3 No' For Mechanical LLDs,does the LLD restrict product flow it it detects a leak? <br /> N/A <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> 0 Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> 0 Yes I ❑ No' ]were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System Certfficatlon Page 3 of 4 12107 <br /> 3 <br />