|
67450.3 3ARCLAYS CALIFORNIA CODE OF REGULATIONS �'���''i f0492-- Title 22
<br /> Lal or public health enforcement agency conccr,.-..g the operation of the 4.An estimate of the exl.-.. d year ofclosuro and a schedule for final
<br /> facility within the last three years,as th documents would be available closure. The schedule for final closure shall include,at a minimum,the
<br /> under the California Public Records Act(Chapter 3.5(commencing with total time required to close each FTU.
<br /> Section 6250)of Part I of Division 7 of itic I of the Government Code) (C)The FTU owner or operator shall maintain the closure plan in com-
<br /> and the information Practices Act of 19 (Chapter I (commencing with pliance with section 66265.112(c); l
<br /> Section 1798)of Title 1.8 of Part 4 of t c Civil Code); (D)Within ninety(90)days after treating the final volume of hazard-
<br /> of
<br /> Maintain compliance with se tions 66264.175, 66265.148, ous waste,the FTU owner or operator shall treat,remove from the facil-
<br /> 67450.7,67450.13,and 66265.404 and v ith the following regulations in ity,or dispose of on—site,all hazardous waste in accordance with the clo-
<br /> chapter 15 of this division, including th se referring to permit applica- sure plan and the applicable requirements of this chapter unless the owner
<br /> tions: or operator demonstrates to CUPA or authorized agency that the activi-
<br /> (A)Article 2.General Facility Stand ds; tics required to complete the closure will require longer than ninety(90)
<br /> (B)Article 3. Preparedness and Prcvc ition; days,or the FTU has the capacity to treat additional wastes,or there is a
<br /> (C)Article 4.Contingency Plan and E mergcncy Procedures; reasonable likelihood that a person other than the owner or operator will
<br /> (D)Article 5.Manifest System,Recor keeping and Reporting(except recommence operation of the FTU(s),and closure of the FTU(s)would
<br /> sections 66265.73(b)(2), 66265 73(b)(6), 66265.73(b)(7), be incompatible with Lhe operation of the facility,and the owner of opera-
<br /> 66265.73(b)(15) and 66265.75); for has Laken and will continue to take all steps necessary to prevent
<br /> (E) Article 9. Use and Management o Containers; threats to human health and the environment;
<br /> (F)Article 10.Tank Systems(except Lf at the contingent plan for post— (E)The FTU owner or operator shall complete closure acti vities in ac-
<br /> closure required by section 66265.197(c) 2)shall be maintained with the cordance with the closure plan within 180 days after treating the final vol-
<br /> closure plan required by subsection(b)(12)(B)of this section); time of hazardous waste unless the owner or operator demonstrates to
<br /> (G) Article 16.Thermal Treatment; CUPA or authorized agency that the activities required to complete the
<br /> (1-1)Article 17.Chemical,Physical,and Biological Treatment. closure will require longer than 180 days to complete,or the FTU has the
<br /> (10) Prepare and submit an annualr port to CUPA or authorized capacity to treat additional wastes,or there is a reasonable likelihood that
<br /> agency when requested by CUPA or aut orized agency.The annual re- a person other than the owner or operator will recommence operation of
<br /> port shall be delivered in person or by cc ified mail with return receipt the FTU(s),and closure of the FTU(s) would be incompatible with the
<br /> requested to CUPA or authorized agency when requested in writing by operation of the facility,and the owner or operator has taken and will con-
<br /> CUPA or authorized agency. The requ t from CUPA or authorized tinue to take all steps necessary to prevent threats to human health and
<br /> agency shall specify where and how to su mit the annual report and the the environment;
<br /> date by which the annual report shall be submitted.The report shall be (F)The FTU owner or operator shall notify the CUPA or authorized
<br /> dated,and signed according to the requirements of section 66270.11 as agency and any other agencies having jurisdiction over the closure proj-
<br /> those requirements apply to permit applica ions,and shall include the fol- ect at(cast fifteen(15)days prior to completion of closure;and
<br /> lowing information for each FTU which p rformed treatment during the (G)The FTU owner or operator shall remain in compliance with all
<br /> calendar year preceding CUPA or authorized agency's request: applicable requirements of this section until the owner or operator sub-
<br /> (A)The serial number(s)of the FTU(s involved in treatment; mits to CUPA or authorized agency a certification signed by the owner
<br /> (B) The physical and mailing addressof the business entity which or operator and by an independent, professional engineer registered in
<br /> owns or operates the FTU(s); California,that closure has been completed in accordance with the clo-
<br /> (C)The name,title and telephone numb r of each FTU contact person; sure plan and that the closure plan meets or exceeds the applicable re-
<br /> (D)The name and address or legal des ription of the facility; quirements of this chapter.
<br /> (E)The facility identification number; (12)If treatment will be conducted in containers,the containment re-
<br /> (F)The number of days each FTU wasoperated; quirements of sections 66264.175 applicable to transfer and storage areas
<br /> (G)The quantity of hazardous waste(s)treated by each FTU; shall be complied with for areas where treatment occurs.
<br /> (1-1)The composition and hazardous chaj acteristics of the influent haz- (d)CUPA or authorized agency,within forty—five(45)calendar days
<br /> ardous waste(s); of receipt of an annual or amended notification submitted pursuant to
<br /> (1)The treatment method(s)used for ca h hazardous waste treated by subsection (c)(1)or(c)(2)of this section,shall acknowledge in writing
<br /> each FTU; receipt of the notification.CUPA or authorized agency shall,in conjunc-
<br /> (J)The quantity,composition and hazaidous characteristic(s)of any Lion with the acknowledgement,reauthorize operation of the FTU sub-
<br /> treatment effluent or residual discharged f om each FTU to a POTW,if jcct to the requirements of this section and sections 67450.7 and
<br /> applicable; and 67450.9(b) and(c),terminate or deny reauthorization to operate under
<br /> (K)The quantity,composition,hazardot s characteristics)and dispo- permit by rule pursuant to section 67450.9(a)or notify the owner or oper-
<br /> sition of any FTU treatment effluent or res dual-that was not discharged ator that the notification is incomplete or inaccurate. If the notification
<br /> to a POTW,if applicable. is incomplete or inaccurate, CUPA or authorized agency shall specify
<br /> (1 1)Maintain compliance with the follo ing requirements regarding what additional information or correction is needed.CUPA or authorized
<br /> closure: agency shall reauthorize or deny reauthorization to operate as specified
<br /> (A)Sections 66264.178,66265.111(a)a id 66265.111(b),in the same in this subsection within forty—five(45)calendar days of receipt of the
<br /> manner as those sections apply to racilitic5 and section 66265.114; requested information or corrected notifications. CUPA or authorized
<br /> (B)The FTU owner or operator shall have a written closure plan.The agency shall reject the notification of any owner or operator who fails to
<br /> closure plan shall include: provide the information or correction requested within ten(10)days of
<br /> 1. A description of how and when each --TU will be closed.The de- receipt of the acknowledgement. Upon good cause shown by the owner
<br /> scription shall identify the maximum exicn.of the operation during the oroperator,CUPAorauthorizedagency shall grant the owner oroperator
<br /> life of the FTU(s), and how the applicab a requirements of sections additional time to provide the information or correction requested. An
<br /> 66264.178, 66265.1 14, 66265.197(x), 66255.197(b), (c)(1) and (c)(2) owner or operator whose notification is rejected may submit a new notifi-
<br /> and 66265.404 will be met; cation.
<br /> 2. An estimate of the maximum inventOly of waste in storage and in NOTG: Authority cited: Sections 25150, 58004 and 58012, Health and Safety
<br /> treatment at any time during the operation f the i.-TU(s)at the facility; Code. 9K25205c1 and tions 5112.5h 5150.Safety 25 5.6,25186.25200, 25200.2,
<br /> 3. A description of the steps needed to econtaminatc the treatment
<br /> equipment during closure;and
<br /> Page 758.338(b)(2) Register'-(XX).No.15:4-14-20(X)
<br />
|