My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
7007
>
3500 - Local Oversight Program
>
PR0545654
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:55:17 AM
Creation date
5/7/2020 11:48:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545654
PE
3528
FACILITY_ID
FA0002499
FACILITY_NAME
LINDEN USD-WATERLOO ELEMENTARY
STREET_NUMBER
7007
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08906065
CURRENT_STATUS
02
SITE_LOCATION
7007 N PEZZI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-71 <br /> WaterWork <br /> Health and Safety Plan <br /> Waterloo School <br /> 7007 Pezzi Road <br /> Stockton, California <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for Waterloo School, provides for the <br /> protection of on-site personnel and the surrounding community <br /> during site characterization and soil excavation activities. The <br /> requirements, specifications and procedures presented with this <br /> plan will apply to all personnel on-site, including employees, <br /> sub-contractors, site visitors and regulatory agency personnel. <br /> KEY PERSONNEL <br /> WaterWork ' s Safety Coordinator/Project Manager will provide <br /> training to site personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> training or protective equipment required for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> site personnel will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> A gasoline fuel distribution facility was previously operated on <br /> the property. Soil samples collected_ during—removal of a 500 <br /> gallon gasoline tank_reported , 59, 322,100, ' 520 ands 3.0257 parts <br /> per million (ppm) (,benzenii�', toluene, L.._ethylbenzene7, rxylE nes and <br /> total_petroleum_hydrocarbons� as gasoline, respectfully. <br /> The activities addressed by this safety plan include soil <br /> excavation and subsurface soil sample collection . Although <br /> exposures at hazardous levels are unlikely, these activities <br /> present the potential for exposure to toxic materials through <br /> both skin contact and inhalation. The subsurface sampling may <br />
The URL can be used to link to this page
Your browser does not support the video tag.