My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
7007
>
3500 - Local Oversight Program
>
PR0545654
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:55:17 AM
Creation date
5/7/2020 11:48:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545654
PE
3528
FACILITY_ID
FA0002499
FACILITY_NAME
LINDEN USD-WATERLOO ELEMENTARY
STREET_NUMBER
7007
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08906065
CURRENT_STATUS
02
SITE_LOCATION
7007 N PEZZI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Sample Containers. Holding Times and Preservation <br /> Holding <br /> Parameter Matri: Container Time Preservation <br /> ------------------------------------------------------------------------------------- <br /> Total Petrol. Sail 3' stainless steel 14 days l/ 4'C <br /> Hydrocarbons or bras■ cylinder 40 days 2/ <br /> (Light Fractions) Vater 40 ■1 glass vial, 14 days l/ 4*C MCI <br /> teflon-fated silicon 20 days 2/ to p8 2 <br /> septum <br /> (Heavy Fractions) Yater 1 amber bottles, 14 days l/ 4'C <br /> teflon meal/silicon 40 days 2/ <br /> septum <br /> Denson* soil 3' stainless steel 14 days l/ 4'C <br /> Toluene or brass cylinder <br /> xylene <br /> Zthylbensone Vater 40 ■1 glass vial. 7 days l/ 4'C act <br /> teflon seal/silicon 14 days 3/ to pH a 2 <br /> purgeable moll 3" stainless steel 14 days 1/ 4'C <br /> 8aloaarbon■ or brass cylinder <br /> Vater 500 at glass vial, 14 days l/ <br /> teflon seal/silicon <br /> septum <br /> Organiclead soil 3' stainless steel 14 days l/ 4'C <br /> or brass cylinder <br /> mater 40 ■1 glass vial. 14 days l/ 4'C <br /> teflon ■eel/ailieon <br /> septum <br /> ithylone Dibromid* soil. 3- stainless stool 14 dare2/ 4'C <br /> or brass cylinder <br /> Vater 40 at glass vial. 14 darel/ 4'C <br /> teflon faced silicon <br /> septum <br /> Polynuclear soil 8 as. wide mouth 14 days l/ 4'C <br /> Aromatic glass with teflon 40 days 2/ <br /> Hydrocarbons goal <br /> Yater 1000 ■1 &mbar glass 7 days l/ 4'C <br /> with teflon seal 40 days 2/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.