Laserfiche WebLink
a <br /> w <br /> i <br /> 6. A technical report will be prepared summarizing the <br /> findings of the investigation and recommending <br /> additional remedial action , if necessary. The field <br /> f 1 investigation will be conducted under the direct <br /> supervision of Russell W. Juncal, CA Registered <br /> r" Geologist No. 3864, who will review and sign the <br /> i summary report. <br /> 4.0 TIME SCHEDULE <br /> Upon receiving approval to re-excavate from San Joaquin <br /> County Environmental Health. The re-excavation will begin <br /> within fifteen working days. Sample results should be <br /> available within fifteen days after collection. <br /> Table 1 <br /> Laboratory Results-Soil <br /> (in ppm) <br /> Sample B T E X TPHG Pb EDB <br /> ----------------------------------------------------------------- <br /> WS—TPI@7.5' 59.03 322.64 100.42 520.54 3025.5 17.5 ND <br /> Note: ppm - Parts Per Million <br /> B - benzene <br /> T - toluene <br /> E = ethylbenzene } <br /> X = xylenes <br /> TPHG = total petroleum hydrocarbons as gasoline <br /> Pb Total Lead <br /> EDB ethylene dibromide <br /> r, <br /> ND non detected <br /> t: <br /> y <br /> t <br /> 3 <br />