Laserfiche WebLink
Linden School District April, 1995 <br /> Site Specific Safety Plan Well Installation <br /> WES Project No 4062-R <br /> Directions to Hospital <br /> Go south on Pezzi Rd to Highway 88 Turn right and proceed approx 5 <br /> miles to Harding Way Turn Right on Harding and proceed approx 112 mile to <br /> California Street and turn right St Josephs Hospital is 3 blocks on the right <br /> Fallow signs to Emergency Entrance <br /> Additional Contin-gency Telephone Numbers <br /> Linden School District <br /> Mr Chuck Altree 887-3020 <br /> Fire Department 464-4646 <br /> Wright Environmental Services, Inc , 833-0758 <br /> Program Manager, Corporate Safety Officer <br /> John Lynch (Mobile) 481 - 1040 <br /> Project Manager/Site Safety Office <br /> Lester Messina (pgr) 547-4699 <br /> SECTION 12 <br /> SAFETY/ORIENTATION TRAINING <br /> 12. 1 FORMAL TRAINING <br /> All WES site personnel shall have completed training relative to the project and <br /> the materials to be encountered during the project This training shall be <br /> conducted by the WES Safety Officer, and shall include classroom and practical <br /> application exercises regarding the hazards to be expected and the protective <br /> equipment to be utilized All employees at the site will be required to have passed <br /> the 40 hour SARA/OSHA training programs for work at Hazardous Materials <br /> Sites <br /> This formal training is supplemented by daily safety briefings and site-specific <br /> training as required All subcontractor personnel will be required to complete <br /> the same basic training, and to attend all safety briefings <br /> SECTION 13 <br /> MEDICAL SURVEILLANCE <br /> WES personnel and subcontractors engaged in project operations shall be <br /> participants in the Medical Surveillance program, and must be cleared by the <br /> examining physician(s) to wear respiratory protection devices and protective <br /> clothing for working with hazardous materials <br />