Laserfiche WebLink
City of Stockton Fire Station #6 <br /> Soil Remediation Plan <br /> Site Code 1013 <br /> June 24, 1992 <br /> Page 5 <br /> Report Preparation <br /> Upon completion of field activities and receipt of laboratory analysis, RESNA will prepare a <br /> technical report summarizing field methods and data collected during the remediation/excavation <br /> if appropriate, this report will be incorporated into the next quarterly monitoring report in the <br /> second 1992 quarterly report due in July of 1992. <br /> Field work proposed in this workplan will be performed according to the Site's Quality <br /> Assurance/Quality Control guidelines and Health and Safety Plan included in Attachments I and <br /> II, respectively. <br /> RESNA is prepared to begin work in accordance with this workplan within two weeks of agency <br /> approval. If you have any questions or concerns regarding this addendum or project, please <br /> contact John P. Lane at (209) 838-3507, at your earliest convenience. <br /> Respectfully, <br /> RESNA Industries, Inc. <br /> SAN JOAQUIN COUNTY <br /> PUBLIC HEALTH SERVICES , <br /> 9 <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Tam J. Lutterman OW P.O. BOX 2009, STOCKTON,CA 95021 <br /> PHONE: (209).468-3420 <br /> Staff Geologist <br /> A <br /> Approved <br /> Cl Approved with changes: See Remarks <br /> ehnP. ane <br /> Project Geologist Cl Disappr ved; See Remarks <br /> Remarks �-_� <br /> Gregory P. Stahl DateIT y <br /> CA Registered Geologist No. 5023 Approval of these plans extends only to that <br /> which is shown and described hereon but <br /> TJL/ggk does not authorize or approve any omission <br /> or deviation of requirements of State laws W <br /> PC: Mr. Jim Escobar local Ordinances. <br /> Mr. James B. Giottonini <br /> SFS592.TJL <br />