Laserfiche WebLink
14 March 2008 <br /> AGE-NC Project No. 99-0592 <br /> Page 2 of 2 <br /> • The forty-eight-hour ground water extraction test employing the monitoring well MW-8, will <br /> be conducted as proposed in the Additional Site Assessment and Aquifer Pump Test Work <br /> Plan). The location of the site is illustrated on Figure 1, a site plan including prosed <br /> monitoring well locations are illustrated on Figure 2. k <br /> J <br /> AGE recommends discontinuing sampling of domestic well DW-1 during quarterly monitoring' I <br /> events.Analytes of concern have not been detected in the water samples collected from DW-1 since: , <br /> February 2000,the initial sampling event.Analytical results for water samples collected from DW-1 <br /> are summarized in historical Tables 2 and 3 included in Appendix B. N'14 k <br /> ' <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> QQo��sPM R <br /> \, * No. 7473 <br /> Lauren Carding William R. Little <br /> Staff Geologist Senior Project Geologist 1p a�P <br /> California Professional Geologis <br /> cc: Ms. Edna Moore <br /> Mr. James Barton, Central Valley Regional Water Quality Control Board <br /> Advanced GeoEnvironemental,Inc. <br />