My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3400
>
2900 - Site Mitigation Program
>
PR0545610
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 12:41:13 PM
Creation date
5/7/2020 12:27:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545610
PE
2952
FACILITY_ID
FA0003920
FACILITY_NAME
JKC TRUCKING INC
STREET_NUMBER
3400
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3400 NEWTON RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised Additional Site Assessment Work Plan <br /> MOORE TRUCK LINES <br /> 3400 Newton Road, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING . . . . . . . . . . . . . . . . . 1 <br /> 2.2. UNDERGROUND STORAGE TANK REMOVAL . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. PREVIOUS SITE ASSESSMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.4. SITE CONCEPTUAL MODEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 2.5. GROUND WATER DEPTH AND FLOW DIRECTION . . . . . . . . . . . . . . . . . . . 4 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2. CPT DRILLING AND SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.3. REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1. CPT SOIL BORINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.2. EQUIPMENT DECONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Plan <br /> Figure 3 - Cross Section A-A' <br /> Figure 4 - Cross Section B-B' <br /> Figure 5 - Cross Section C-C' <br /> TABLES <br /> Table 1 -Analytical Results of UST Removal Soil Samples <br /> Table 2 -Analytical Results of UST Removal Stockton Soil Samples <br /> Table 3 -Analytical Results of Soil and Ground Water Samples <br /> Table 4 -Analytical Results of Soil Samples <br /> Table 5 - Ground Water Elevation Data <br /> Table 6 -Analytical Results of Ground Water Samples -EPA Methods 801 SM/8021 <br /> Table 7 -Analytical Results of Ground Water Samples -EPA Methods 8260B <br />
The URL can be used to link to this page
Your browser does not support the video tag.