Laserfiche WebLink
5.0 Schedule <br /> ek I <br /> It is anticipated that the fieldwork can be completed in one day. Faxed copies of the laboratory <br /> analytical data should be received within 2 weeks following sample submittal. Hard copies of <br /> the laboratory reports should be received approximately three weeks following corn letion of the <br /> fieldwork- IT expects that a draft of the report will be available for Caltrans review <br /> x <br /> approximately four weeks following completion of the fieldwork. <br /> 1I <br /> I� <br /> I! <br /> I <br /> E� <br /> k <br /> 'F <br /> E> <br /> I <br /> z s <br /> .i <br /> li <br /> 'I <br /> Y I <br /> II <br /> {{g{ I <br /> 1 <br /> =4 I <br /> SacDP-N.-\rancfpl\PrnjectlhB 835278\wkpin&hspV,&CPT wkp.&c <br /> 2/4,72 <br /> h <br />