Laserfiche WebLink
GENERAL CONDITIONS (CONTINUED) <br /> Paragraph aph Page <br /> 4. SCOPE AND INTENT OF CONTRACT <br /> G4.01 Intent of Plans and Specifications G-12 <br /> G4. 02 Clarification of Contract Documents G-13 <br /> G4. 03 Changes G-13 <br /> G4. 04 Use of Completed Portions G-13 <br /> G4.05 Effect of Inspection or Use G-13 <br /> G4.06 Effect of Extension Time G-13 <br /> G4.07 Subcontracting and Assignment G-14 <br /> G4.08 Recognition of Subcontractors G-14 <br /> G4 . 09 Lands and Rights of Way G-14 <br /> G4. 10 Liability of Agency Officials G-14 <br /> G4.11 Contractor Not an Agent of the Agency G-15 <br /> G4 .12 Guarantee G-15 <br /> 5. CONTROL OF THE WORK <br /> IG5 .01 Plans and Specifications Furnished G-16 <br /> G5.02 Supplemental Drawings G-16 <br /> G5.03 Legal Address of the Contractor G-16 <br /> G5.04 Personal Attention and Superintendence G-16 <br /> G5 .05 Authority of the Engineer G-17 <br /> G5.06 Inspection G-17 <br /> G5 .07 Surveys G-17 <br /> G5. 08 Materials and Tests G-18 <br /> G5.09 Plant Inspection G-18 <br /> G5. 10 Materials or Equipment Specified by Name G-19 <br /> G5. 11 Property Rights in Materials G-19 <br /> G5. 12 Contractor ' s Equipment G-19 <br /> G5.13 Dismissal of Unsatisfactory Employees G-20 <br /> G5. 14 Termination of Unsatisfactory Subcontracts G-20 <br /> G5 . 15 Temporary Suspension of Work G-20 <br /> G5. 16 Termination of Contract G-21 <br /> G5 .17 Suspension of Work Because of Conditions <br /> Beyond Control of Agency or Contractor G-22 <br /> 6. LEGAL RELATIONS AND RESPONSIBILITY <br /> G6 . 01 Compliance with Laws and Regulations G-22 <br /> G6 . 02 Responsibility of the Contractor G-25 <br /> G6. 03 Permits and Licenses G-26 <br /> Gb . 04 Protection of Agency Against Patent Claims G_26 <br /> G6 . 05 Protection of Workman <br /> ' G6 . 06 Protection of Materials and Equipment G-27 <br /> G6 . 07 Sanitary Provisions G-27 <br /> G6 .08 Public Convenience G-27 <br /> iii <br />