My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 SECTION 02221 <br /> s UTILITY TRENCHING & BACKFILLING <br /> 4 <br /> s <br /> 6 PART 1 : GENERAL <br /> 7 <br /> 8 1.01 DESCRIPTION <br /> s <br /> 10 The work of this section consists of trenching and backfilling for the construction an <br /> 11 installation of pipelines, conduits and cables. All trenching will be open cut. It includes <br /> 12 all clearing and grubbing, drilling and blasting, construction of cribbing and cofferdams, <br /> 13 dewatering, incidental work, and providing specified backfill. <br /> 14 <br /> 15 1.02 DEFINITION <br /> 1s <br /> 17 Materials used in backfill, as shown in trench details, are defined as follows: <br /> 18 <br /> 19 A. Bedding (BD): When rock, unstable material or wet trench is encountered at the excavated <br /> 20 grade for utility installation, bedding is required. Materials shall be predominantly sand and <br /> 21 gravel, having a plasticity index less than 6. Bedding may be omitted if, in the opinion of <br /> 22 the Engineer, the excavated trench bottom will adequately support and not damage the <br /> 23 utility line. <br /> 24 <br /> 25 1. BD-1: Gradation as follows: <br /> 2s <br /> 27 Sieve size Percent Passing <br /> 28 <br /> 29 No. 4 100 <br /> 30 No. 8 55 - 80 <br /> 31 No. 40 15 - 30 <br /> 32 <br /> 33 2. BD-2: Gradation as follows: <br /> 34 <br /> 35 Sieve Size Percent Passing <br /> 36 <br /> 37 1/2-inch 100 <br /> 38 No. 4 50 - 80 <br /> 39 No. 40 10 - 25 <br /> 40 <br /> 41 3. BD-3: Gradation as follows: <br /> 42 <br /> 43 Sieve Size Percent Passing <br /> 44 <br /> 45 1-1/2-inch 100 <br /> 46 1/2-inch 45 - 75 <br /> 47 No. 40 5 - 15 <br /> UTILITY TRENCHING & BACKFILLING <br /> 042894 02221-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.