My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Where pavement or surfacing is to be placed around or adjacent to manholes or <br /> z drainage inlets which will be located within traffic lanes, such structures shall not be <br /> 3 constructed to final grade until after the pavement or surfacing has been placed around <br /> 4 these locations. <br /> 5 <br /> 8 7. Where a schedule for placing concrete is shown on the plans no deviation will be <br /> 7 permitted therefrom unless approved in writing by the Engineer. , <br /> 8 <br /> 9 8. Mixed concrete, after being deposited, shall be consolidated until all voids are filled and <br /> 10 free mortar appears on the surface. The concrete shall be placed as nearly as possible <br /> >> in its final position and the use of vibrators for extensive shifting of the mass of fresh <br /> 12 concrete will not be permitted. Except for concrete used in cast-in-place piles, fresh <br /> 13 concrete shall not be permitted to fall from a height greater than 4 feet without the use <br /> 14 of adjustable length pipes, tubes or double belting placed to prevent segregation of the , <br /> 15 concrete. Double belting shall not be used unless the thickness of the member is less <br /> 18 than 16 inches. <br /> n <br /> 18 9. In vertical sections, concrete shall be deposited continuously in horizontal layers of 24 , <br /> 19 inches maximum depth so as to maintain a horizontal plastic surface until the completion <br /> 20 of the unit. No concrete shall be deposited on concrete which has hardened sufficiently <br /> 21 to cause the formation of seams and planes of weakness within the section. <br /> 22 <br /> 23 10. Concrete for horizontal members or sections shall not be placed until the concrete in the <br /> 24 supporting vertical members or sections is no longer plastic and has been in place at <br /> 25 least two hours. <br /> 28 <br /> 27 11. In all slabs, concrete shall be deposited in a continuous or monolithic operation to the , <br /> 28 full thickness of the slab. Each batch shall be dumped against previously placed <br /> 29 concrete and not away from it, and shall not be dumped in separate piles and then <br /> 30 worked together. <br /> 37 <br /> 32 12. Concrete shall not be mixed or placed while the atmospheric temperature surrounding <br /> 33 the work is at or below 35 degrees F., nor when there is indication that the temperature <br /> 34 may drop below 35 degrees F, within 24 hours. , <br /> 35 <br /> 38 13. The concrete in each integral part of the structure shall be placed continuously, and <br /> 37 work will not be allowed to commence on any such part unless sufficiently inspected and <br /> 38 approved material for the concrete is on hand, and forces and equipment are sufficient ' <br /> 39 to complete the part without interruption in the placing of the concrete. <br /> 40 <br /> 41 C. Concrete Vibrating: <br /> 42 <br /> 43 1. With the exception of concrete placed as pipe culvert headwalls and endwalls, slope <br /> 44 paving and aprons, and concrete placed under water, all concrete shall be consolidated <br /> 45 by means of high frequency internal vibrators within 15 minutes after it is deposited in <br /> 48 the forms. The vibrators shall not be attached to or held against the forms or the <br /> 47 reinforcing steel. The vibrating shall be done with care and in such manner that <br /> 48 displacement of reinforcement, ducts, and embedded items is avoided. <br /> 49 <br /> 50 2. All concrete shall be consolidated by vibration so that the concrete is thoroughly worked <br /> 51 around the reinforcement, around embedded items, and into corners of forms, ' <br /> 52 eliminating all air or stone pockets which may cause honey-combing, pitting, or planes <br /> CONCRETE <br /> 042894 03100-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.