Laserfiche WebLink
' 1 c. Reduction in thickness: minus 5 percent of specified thickness. <br /> 2 <br /> 3 7. Variation in Steps: <br /> a <br /> s a. In a flight of stairs: rise, 1/8-inch; tread, 1/4-inch. <br /> 6 <br /> 7 b. In consecutive steps: rise, 1/16-inch; tread, 1/8-inch. <br /> e <br /> 9 8. Variation from established lines and grades in sidewalks, plazas, outdoor concrete slabs, <br /> 10 curb and gutter sections: in 10 feet, 1/4-inch; in 1 foot, 1/8-inch. <br /> 11 <br /> 12 3.06 REINFORCEMENT <br /> 13 <br /> ' 14 A. Design: The reinforcement design shown on drawings shows only the necessary information <br /> 15 for detailing the reinforcement and preparing placing and bending details. Prior to starting <br /> 16 concrete work, submitted detailed shop drawings shall be approved. <br /> ' 17 <br /> 18 B. Bending: In accordance with CRSI Manual of Standard Practice, Chapter 7. <br /> 19 <br /> 20 C. Placement: Place reinforcement accurately as shown. Adequately secure metal reinforcement <br /> 21 in position by concrete or metal chairs and spacers, in accordance with CRSI Manual of <br /> 22 Standard Practice, Chapter 8. Distance between the steel and the surface, as shown; <br /> 23 otherwise, in accordance with Chapter 8. In walls, use bolsters between form and <br /> 24 reinforcement to prevent lateral displacement of reinforcement and to insure proper concrete <br /> 25 cover. <br /> 26 <br /> 27 D. Splices: Locate splices of reinforcement as shown. For any splices not shown, assume <br /> 26 Class B splice. See drawings for splice lengths. Stagger splice in adjacent bars. Lap <br /> 29 adjacent sheets of wire mesh a minimum of 6 inches and securely wire. <br /> 30 <br /> 31 E. Inspection: After reinforcement has been placed, it shall be inspected and approved before <br /> 32 placing concrete. <br /> 33 <br /> 34 F. Conditions of Surfaces: At time concrete is placed, all metal reinforcement shall be free from <br /> 35 rust, scale, frost, or other coatings that would destroy or reduce the bond. <br /> 36 <br /> 37 3.07 JOINTS AND EMBEDDED ITEMS <br /> ' 38 <br /> 39 A. Construction Joints: <br /> 40 <br /> 41 1. Obtain approval for joints not shown and locate them where they least impair the <br /> 42 strength of the structure. Unless otherwise shown on the drawings, joints in walls and <br /> 43 columns shall be at the underside of floors, slabs or beams, and at the top of footings <br /> 44 or floor slabs. Place beams at the same time as slabs. At least two hours shall elapse <br /> 45 after depositing concrete in columns or walls before depositing concrete in supported <br /> 46 beams or slabs. As the new concrete is placed, re-vibration in tops of columns and <br /> 47 walls is desirable. Make joints perpendicular to the main reinforcement. <br /> 48 <br /> as 2. All horizontal construction joints in walls shall have a continuous wood screed strip at <br /> 50 the outer face of joint to form a true line. Screeds shall be removed and the reglet <br /> 51 thoroughly cleaned out before pouring the next portion of wall. <br /> 52 <br /> CONCRETE <br /> 042894 03100-11 <br />