Laserfiche WebLink
D. Test reports shall be sent to the Engineer with copies to the Contractor. <br /> 2 <br /> 3 3.21 DAMAGED OR DEFECTIVE CONCRETE <br /> 4 <br /> s Remove damaged or defective concrete before completion and acceptance of the work and <br /> s replace with acceptable concrete. <br /> 7 <br /> a <br /> s <br /> io <br /> END OF SECTION <br /> 1 <br /> 1 <br /> r <br /> r <br /> ' CONCRETE <br /> 042894 03100-17 <br />