My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 SECTION 07100 <br /> 2 <br /> 3 WATERPROOFING <br /> 4 <br /> 5 <br /> 6 PART 1 : GENERAL <br /> 7 <br /> 8 1.01 DESCRIPTION <br /> 9 <br /> 10 The work of this Section consists of furnishing and installing waterproofing required for this <br /> 11 work as indicated on the Drawings and includes, but is not necessarily limited to masonry <br /> 12 waterproofing. <br /> 13 <br /> 14 1.02 RELATED WORK SPECIFIED ELSEWHERE <br /> 15 <br /> 16 Section 02225: Structure Excavation and Backfill <br /> 17 <br /> 18 1.03 QUALITY ASSURANCE <br /> ' 19 <br /> zo A. Qualifications of Installers: Provide at least one person who shall be present at all times <br /> 21 during execution of this portion of the work and who shall be thoroughly experienced in <br /> 22 installation of the specified products and shall direct all work performed under this Section. <br /> 23 <br /> za B. Manufacturer's Certification: Prior to start of installation of the work of this Section, secure <br /> 25 a visit to the job site by a representative of the manufacturer of the waterproofing materials <br /> 26 used, who shall inspect and shall certify: <br /> 27 <br /> 28 1. That the surfaces to which waterproofing are to be applied are in condition suitable for <br /> 29 that application. <br /> 30 <br /> 31 2. That the materials installed complied in all respects with the requirements of this <br /> 32 Section of these Specifications. <br /> ' 33 <br /> 34 3. That the materials were installed in complete accordance with the manufacturer's <br /> 35 current recommendations. <br /> 36 <br /> 37 1.04 SUBMITTALS <br /> 38 <br /> 39 A. Materials List: Before any waterproofing materials are delivered to the job site, submit a <br /> 40 complete list of all materials proposed to be furnished and installed under this portion of <br /> 41 the work, making the submittal in accordance with the provisions of Section 01300 of these <br /> 42 Specifications. <br /> 43 <br /> as B. Manufacturer's Certification: Upon completion of this portion of the work, and as a <br /> 45 condition of its acceptance, deliver two copies of the certification described in Article 1.02-B <br /> 46 above, each copy signed by an officer of the firm manufacturing the waterproofing materials <br /> ' 47 used. <br /> 48 <br /> 49 1.05 PRODUCT HANDLING <br /> 50 <br /> 51 A. Protection: Use all means necessary to protect waterproofing materials before, during, and <br /> ' WATERPROOFING <br /> 050694 07100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.